Skip to main content

LA’s Ribbon of Light viaduct cast into darkness

Thieves have been pulling copper wiring out of electrical boxes Los Angeles’ 6th Street Viaduct and selling it for scrap, prompting police to report that “the Grinch stole all the Christmas lights”.
By David Arminas January 10, 2024 Read time: 3 mins
LA’s 6th Street Viaduct in brighter times (image courtesy HNTB)

Thieves have been stealing copper wire from the lighting system of LA’s 6th Street Viaduct, casting sections of the steel and concrete structure into darkness.

The award-winning 1.1km long and 14m wide bridge spanning Los Angeles’ historic Boyle Heights opened in July 2022 as a replacement for a 1932 bridge. It features 10 pairs of 9.1m and 18.2m concrete canted arches that are illuminated with different colours. The four-lane viaduct has wide pedestrian paths on both sides.

Since its opening, the bridge – the longest in Los Angeles City - has become the backdrop for thousands of people who pose or play on the structure for their social media sites, according to a report in the Los Angeles Daily News newspaper. This included drivers who would take over the bridge to perform illegal maneuvers.

Thieves have pulled the copper wiring out of dozens of electrical boxes and it for scrap, prompting local police to report that “The Grinch stole all the Christmas lights”, the newspaper said. However, the problem of thieves stealing copper wiring from many infrastructure projects across the US at all times of year is unfortunately common.

The newspaper noted that for the opening of the bridge in 2022 – after six years of construction - thousands of locals came out to celebrate on the structure noted for its unusual arch design. The bridge has had been

But police have had to periodically close the bridge because of drivers doing stunts, people climbing on the arch loops and skateboarders riding them like ramps. There was even a barber cutting a client’s hair in the middle of traffic, said the newspaper. Last May, a 17-year-old slipped to his death while attempting to scale part of the bridge.

The earlier viaduct on this site, built in 1932, was closed for demolition in January 2016 and demolished due to serious structural issues, including several large cracks, resulting from the high alkaline content of the concrete composition, due to architectural unsophistication. As a result, concerns over the structure's seismic instability outweighed its historical status, leading to its closure.

The new bridge spans the LA River and the 101 Freeway, local surface roads as well as 18 railroad tracks operated by five different railroad agencies including Union Pacific and Metrolink. It was designed by the HNTB which led an international competition decided by public vote. The viaduct accommodates vehicles and pedestrians, as did the original bridge, and provides dedicated lanes for bikes.

The overall project included a 12-acre public park running below the bridge, accessible by multiple stairways and a helical bike ramp which also lead to recreational fields with restrooms and café, the LA River, public art and an arts plaza.

HNTB says that it is the largest bridge project in the history of the City of Los Angeles and winner of  American Council of Engineering Companies' 2023 Grand Conceptor Award.

For more information on companies in this article

Related Content

  • Colombia road tolling contract
    June 20, 2016
    DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system The contract is to renovate the technology used at three toll plazas and a control centre fo
  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl