Skip to main content

German Joh. Sahler contractor goes down the Hitachi route

German contractor Joh. Sahler has changed its entire fleet of construction machinery to Hitachi Zaxis excavators. The two ZX38U-5s, ZX48U-3, ZX85USBLC-5, ZX145W-3, ZX170W-5 and ZX190W-3 were ordered by the Leverkusen-based company in June last year and delivered by the country’s authorised Hitachi dealer, Kiesel. Joh. Sahler was founded in 1945 and is now owned by a third-generation family member, Antonius Eisbach, and managed on a day-to-day basis by directors Dietmar Müller and Matthias Schindler. It has
April 30, 2015 Read time: 3 mins
German contractor Joh. Sahler has changed its entire fleet of construction machinery to Hitachi Zaxis excavators. The two ZX38U-5s,

ZX48U-3, ZX85USBLC-5, ZX145W-3, ZX170W-5 and ZX190W-3 were ordered by the Leverkusen-based company in June last year and delivered by the country’s authorised Hitachi dealer, Kiesel.

Joh. Sahler was founded in 1945 and is now owned by a third-generation family member, Antonius Eisbach, and managed on a day-to-day basis by directors Dietmar Müller and Matthias Schindler. It has a team of 50 employees who work on road and sewer construction projects for mostly privately owned clients but also some public sector customers.

All of the new machines are supported by a five-year maintenance and service package provided by Hitachi Support Chain and managed by Kiesel. “Kiesel contacted us at exactly the right time at the end of 2013, when we first considered changing all of our machines,” said Matthias.

“We wanted to buy established products that our customers would recognise and feel comfortable with. These machines need to be reliable and work well for at least five years and that is why we have invested in the after-sales package.”

The two-piece boom Hitachi ZX170W-5 wheeled excavator is the largest Zaxis-5 machine at Joh. Sahler’s disposal. It was delivered in July and one of its first assignments was a road construction project near Leverkusen. The €450,000 contract to build a roundabout started at the end of September and was scheduled to finish in December. The ZX170W-5 was the only wheeled excavator on the 3,400m² site, which includes 1,500m² of new road, 100m² of new foot and cycle paths and streetlights and the planting of trees.

“The ZX170W-5 is suited to this type of work, and along with the ZX145W-3 and ZX190W-3, we have a range of wheeled excavators to cover the full scale of our operations,” said Matthias. “It is a classic machine for working on roads, as it is fast and versatile, and can be used on and off road. We’re very happy with our current line-up of machines because our maintenance costs are lower than before and there is minimal downtime.”

“I’m really happy with the overall performance of the ZX170W-5,” explained the ZX170W-5’s operator Mario Tietje, who has been with the company for 30 years. “The cab has more than enough space and a comfortable seat, which is important when working on site for the whole day. It is perfectly suited to this type of road construction work and the best feature is the hydraulics, which work quickly and ensure that the machine is easy to operate.”

Related Content

  • Hitachi’s electric drive project for Europe
    October 26, 2018
    Hitachi Construction Machinery is partnering with Kiesel Technologie Entwicklung (KTEG) to develop electric construction machinery for sale in Europe. Kiesel is one of Hitachi’s European distributors and the agreement will also include developing special application products for the European market. Hitachi Construction Machinery has previously developed electric construction machinery to help lower running costs and environmental impact. Previous electric machines from the company include small-medium si
  • Volvo CE’s electric quarry operation commences trials
    August 29, 2018
    Volvo CE is commencing operations of its low emission quarrying operation in Sweden. The facility has a strong focus on electric machines, with diesel-electric hybrid equipment also being used. According to the firm, this is a world first for a quarry facility that can be run almost 'emission-free'. Volvo CE and its customer Skanska have now commenced testing the viability of the Electric Site concept at Skanska’s Vikan Kross quarry, located near Gothenburg in Sweden. The production system at the site
  • Hitachi restructuring its European factories
    March 14, 2017
    Hitachi Construction Machinery (Europe) NV (HCME) intends to reorganise its European manufacturing operations. The firm has two factories in Oosterhout and Amsterdam and is making the change in a bid to boost both efficiency and competitiveness, with this move planned to be complete by April 2018. The current Oosterhout factory is to focus its entire operation on mini and compact excavators, ranging from 1-8tonnes. Hitachi says that its market share in this segment has risen significantly in recent years
  • Concrete pumps speed busy road upgrade
    February 14, 2012
    WORK ON a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city. The junction, when viewed from above, looks like a flatly pressed four-leaf clover, and can no longer cope with traffic volumes. Two national motorways, the A 9 and the A 92, intersect at the