Skip to main content

Extra cash to fix England's winter potholes

Councils in England will be given more than £100 million (US$161.7 million) of extra funding to spend on repairing potholes, Transport Secretary Philip Hammond has said.
March 5, 2012 Read time: 2 mins
Councils in England will be given more than £100 million (US$161.7 million) of extra funding to spend on repairing potholes, Transport Secretary Philip Hammond has said.

The funding is in addition to the £831 million ($1.34 billion) already provided to councils for road maintenance this year and the £3 billion ($4.8 billion) the government has committed over the next four years.

The severe weather at the end of 2010 has left many local roads in a poor condition. Every local authority has a responsibility to properly maintain their roads, including planning winter resilience measures, but the exceptional weather has caused significant additional damage.

The Transport Secretary said: "Millions of motorists across the country have their daily drives ruined by potholes. And the awful winter weather we had this year is only going to make that problem worse.

"That is why, despite the tough financial position we are in, we are going to give councils over £100 million extra to help carry out much needed repairs to England’s roads.

"I am determined to see the winter damage to our roads fixed as quickly as possible and we will be working with councils to make sure that happens."

To make sure that councils are able to make use of this money as soon as possible, the funds will be distributed to English local authorities based on the amount and condition of roads the authority is responsible for rather than councils needing to apply for the funding.

In order to qualify for this extra funding and to promote greater transparency and accountability, local authorities will need to publish information on their website by 30 September, 2011 showing where this money has been spent.

Related Content

  • TRA 2014 showcases the best of cutting-edge transport research and thinking
    July 1, 2014
    Despite tight finances due to the current global economic climate, the recent Transport Research Arena (TRA) 2014 show in Paris showed how innovative transport research, largely using cutting-edge ITS, is creating safer and smarter highways of the future. Guy Woodford reports How far can you drive around a car race track with no other vehicles on it on half a glass of fuel while attempting to maintain a speed of 60kph? After taking up the challenge offered by the Eco Driving Simulator using SiVIC (Simulatio
  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • ALARM survey wins the argument for UK government backing and more road spending
    February 27, 2015
    A UK-based “Annual Local Authority Road Maintenance (ALARM) Survey” has proved so successful that its backers believe it has started to change government policy and attitudes to the country’s road maintenance plan. ALARM, which is backed by the Asphalt Industry Alliance (AIA), has encouraged the UK government to introduce a new long-term 5-year £1 billion road maintenance funding plan and its findings are being openly used by senior members of the Cabinet said Rick Ashton, market development manager at Tota
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.