Skip to main content

Diefenbaker Bridge saved from tolling

Canada's Prince Albert city will not toll the ageing two-lane Diefenbaker Bridge
By David Arminas February 11, 2020 Read time: 2 mins
Diefenbaker Bridge in Prince Albert, western Canada: tolling ruled out for the immediate future (image City of Prince Albert©)

The western Canadian city of Prince Albert will not toll the ageing Two-lane Diefenbaker Bridge after city council vetoed the proposal.

The bridge was opened in 1960 and is maintained by the city under a 1958 agreement whereby the province of Saskatchewan covers 50% of structural repair costs. Tolling would have helped pay for a second crossing of the North Saskatchewan River and local residents could have been exempt from paying.

Around 24,000 vehicles use the bridge daily, with peak hours reaching 2,500. The city and surrounding area has population of about 45,000. The bridge is named after Canada’s 13th prime minister, John Diefenbaker, in office from 1957–63.

The 305m-long bridge is continuous over seven spans but consists of two structures: one northbound and one southbound. Each structure is a two-plate girder steel bridge. A canoeist passing under the bridge in 2011 noticed a crack in the southbound structure and the police quickly closed the bridge pending a study.

According to Stantec Engineering, “the bridge had actually fractured—there was a major crack running from the bottom flange nearly the full height of the girder—one of the largest fractures of its kind”.

Analysis found the cracks were caused by constraint induced fracture. CIF happens at gusset plate connections where loads applied by several members, stiffeners and gusset plates result in high triaxial tension. This hampers ductile behaviour of the connection, triggering flaw growth leading to fracture.

Repairs consisted of three large towers erected underneath the structure: one tower on each side of the fractured girder and a third tower under the non-fractured girder. All the floor beams and cross-bracing were supported. Finally, the old section of the fractured girder was removed and replaced with a new section.

Related Content

  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • Tunnel essential to reduce congestion
    February 21, 2012
    Vietnam's Ho Chi Minh City's dense population, which was estimated to be 10,680 persons/km2 in 2005, is, over the next ten years, set to benefit from the completion of the Thu Thiem Urban Area project, which will provide homes for up to 200,000 people.