Skip to main content

Diefenbaker Bridge saved from tolling

Canada's Prince Albert city will not toll the ageing two-lane Diefenbaker Bridge
By David Arminas February 11, 2020 Read time: 2 mins
Diefenbaker Bridge in Prince Albert, western Canada: tolling ruled out for the immediate future (image City of Prince Albert©)

The western Canadian city of Prince Albert will not toll the ageing Two-lane Diefenbaker Bridge after city council vetoed the proposal.

The bridge was opened in 1960 and is maintained by the city under a 1958 agreement whereby the province of Saskatchewan covers 50% of structural repair costs. Tolling would have helped pay for a second crossing of the North Saskatchewan River and local residents could have been exempt from paying.

Around 24,000 vehicles use the bridge daily, with peak hours reaching 2,500. The city and surrounding area has population of about 45,000. The bridge is named after Canada’s 13th prime minister, John Diefenbaker, in office from 1957–63.

The 305m-long bridge is continuous over seven spans but consists of two structures: one northbound and one southbound. Each structure is a two-plate girder steel bridge. A canoeist passing under the bridge in 2011 noticed a crack in the southbound structure and the police quickly closed the bridge pending a study.

According to Stantec Engineering, “the bridge had actually fractured—there was a major crack running from the bottom flange nearly the full height of the girder—one of the largest fractures of its kind”.

Analysis found the cracks were caused by constraint induced fracture. CIF happens at gusset plate connections where loads applied by several members, stiffeners and gusset plates result in high triaxial tension. This hampers ductile behaviour of the connection, triggering flaw growth leading to fracture.

Repairs consisted of three large towers erected underneath the structure: one tower on each side of the fractured girder and a third tower under the non-fractured girder. All the floor beams and cross-bracing were supported. Finally, the old section of the fractured girder was removed and replaced with a new section.

Related Content

  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Canadian tower tops out on Gordie Howe
    December 21, 2023
    The six-lane cable-stayed bridge project includes new customs plazas in both Detroit and Windsor as well as a new link to the I-75 interstate highway in Detroit.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Aecon sells Ontario road business to GIP
    May 18, 2023
    Canadian infrastructure group Aecon has sold its Ontario-based construction and aggregates business Aecon Transportation East to Green Infrastructure Partners.