Skip to main content

Diefenbaker Bridge saved from tolling

Canada's Prince Albert city will not toll the ageing two-lane Diefenbaker Bridge
By David Arminas February 11, 2020 Read time: 2 mins
Diefenbaker Bridge in Prince Albert, western Canada: tolling ruled out for the immediate future (image City of Prince Albert©)

The western Canadian city of Prince Albert will not toll the ageing Two-lane Diefenbaker Bridge after city council vetoed the proposal.

The bridge was opened in 1960 and is maintained by the city under a 1958 agreement whereby the province of Saskatchewan covers 50% of structural repair costs. Tolling would have helped pay for a second crossing of the North Saskatchewan River and local residents could have been exempt from paying.

Around 24,000 vehicles use the bridge daily, with peak hours reaching 2,500. The city and surrounding area has population of about 45,000. The bridge is named after Canada’s 13th prime minister, John Diefenbaker, in office from 1957–63.

The 305m-long bridge is continuous over seven spans but consists of two structures: one northbound and one southbound. Each structure is a two-plate girder steel bridge. A canoeist passing under the bridge in 2011 noticed a crack in the southbound structure and the police quickly closed the bridge pending a study.

According to Stantec Engineering, “the bridge had actually fractured—there was a major crack running from the bottom flange nearly the full height of the girder—one of the largest fractures of its kind”.

Analysis found the cracks were caused by constraint induced fracture. CIF happens at gusset plate connections where loads applied by several members, stiffeners and gusset plates result in high triaxial tension. This hampers ductile behaviour of the connection, triggering flaw growth leading to fracture.

Repairs consisted of three large towers erected underneath the structure: one tower on each side of the fractured girder and a third tower under the non-fractured girder. All the floor beams and cross-bracing were supported. Finally, the old section of the fractured girder was removed and replaced with a new section.

Related Content

  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,