Skip to main content

Compact construction machines refurbish football stadium

Two JCB customers have netted a prestigious contract for redeveloping a key stadium for the Brazil 2014 World Cup. AMP Locações and MG Porto have teamed up to provide five JCB machines for the redevelopment of the Governador Plácido Castelo Stadium in the city of Fortaleza, which will host six games in the world’s biggest football tournament.
May 11, 2012 Read time: 1 min
A JCB Loadall telescopic handler takes on concrete for the stadium refurbishment
Two 255 JCB customers have netted a prestigious contract for redeveloping a key stadium for the Brazil 2014 World Cup.

AMP Locações and MG Porto have teamed up to provide five JCB machines for the redevelopment of the Governador Plácido Castelo Stadium in the city of Fortaleza, which will host six games in the world’s biggest football tournament.

Known as Castelão, the stadium is currently being expanded to take up to 67,000 fans by the time the tournament kicks-off in June 2014. AMP Locações and MG Porto are carrying out demolition and materials handling work on the project.

JCB 3CX and JCB 4CX backhoe loaders have been equipped with hydraulic breakers to demolish the stadium’s upper cover; a 1CX backhoe loader is used to access confined spaces, and two JCB Loadall telescopic handlers are also being used.

For more information on companies in this article

Related Content

  • Latin America construction machine demand to grow
    December 15, 2017
    Demand in Latin America for heavy construction equipment is expected to continue growing - Allied Market Research reports. Latin America is set to see strong growth in demand for construction machines. This is according to a new report published by Allied Market Research, called Latin America Heavy Construction Equipment Market by Equipment, Application, and End User: Opportunity Analysis and Industry Forecast, 2014-2022. The report shows that the market size for Latin America’s off-highway equipment sector
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • Sandvik tunnelling equipment boosts Sochi 2014
    August 28, 2013
    Sandvik Construction is among leading equipment manufacturers playing a key role in building a network of road and rail tunnels on one new and one existing transport route in and around the Russian coastal city of Sochi as part of a US$47.75 billion investment in preparations for the Sochi 2014 Winter Olympics. Guy Woodford reports Sandvik Construction’s tunnelling equipment team in Russia have been very much in demand over the past three years. Since 2010, they have been overseeing the seven Russian c