Skip to main content

Cleveland to renovate Redcliffe Bridge

The iconic UK bascule bridge crossing Bristol city’s harbour was built in 1942.
By David Arminas March 19, 2021 Read time: 2 mins
The structure is a steel counterbalanced, single 15.5m-long leaf bridge with a 15.5m span (photo courtesy Bristol City Council)

Cleveland Bridge in the UK will renovate the city of Bristol’s Redcliffe Bridge, a bascule crossing of the harbour and which was built in 1942.
 
The iconic two-lane bridge, which links Redcliffe Way to the city centre, underwent a major electrical and control system refit in 1996. A full electrical and mechanical inspection was completed by CH2MHill - now part of Jacobs Engineering Group - in June 2017 with the intention to extend the life of the bridge by 20 years.
 
As principal contractor, Cleveland Bridge, along with Jacobs' design house, will start work likely in April. Work includes refurbishment of the internal steelwork and bridge parapet, water proofing of the bridge deck and mechanical and electrical modifications. Traffic gates and machinery will be replaced with rising-arm barriers.

“Alongside our proud reputation for building bridges in the UK and around the world we are also gaining a strong track record for rehabilitation projects, which is extending the life of important pieces of transport infrastructure such as the iconic Redcliffe Bridge,” said Chris Droogan, managing director of Cleveland Bridge.
 
According to the CH2MHill report, the structure is a steel counterbalanced, single 15.5m long leaf bridge with a 15.5m span. The bridge has not been regularly raised for several years renovation work will include make raising the bascule totally automatic unlike now where an operator must initiative consecutive phases of the raising.

Renovations costs have risen dramatically – 40 per cent - since last year, according to local media reports. Bristol City Council had budgeted £3 million (€3.5 million/US$4.2 million) to repair the bridge and was expecting to award a 16-month contract last September. But another £1.25million (€1.5 million/$1.75 million) has been added to the cost and work is expected to finish in March 2022, two months later than previously planned.

For more information on companies in this article

Related Content

  • Hill & Smith reports strong performance
    May 17, 2016
    Hill & Smith Holdings reports a good start to the year, with trading ahead of expectations. The firm’s latest trading update runs from 1st January 2016 to 30th April 2016. The board says it is pleased to report that trading in the period has been encouraging and is ahead of the expectations that it set out at the time of reporting its 2015 preliminary results in March. Revenue for the period was £163.1 million, compared with £153.2 million for the same period in 2015. This represent a 2% organic increase
  • Merseylink wins US$3.12bn Mersey Gateway Project contract
    June 20, 2013
    Merseylink was today announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project in North West England. Making the announcement together in the observatory in the Catalyst Museum in Widnes overlooking the River Mersey, Halton Borough Council and Merseylink also confirmed they have jointly identified savings amounting to “tens of millions of pounds” on the projected public sector contribution to the project budget.
  • Trail blazing for the Gordie Howe Bridge
    February 23, 2024
    Gordie Howe International Bridge between Canada and the US will become the first international bridge to link national trail systems across the border.
  • UK hosts world’s first zero-emissions Portland cement industrial trial
    February 8, 2023
    The UK is hosting the world’s first zero-emissions Portland cement industrial trial