Skip to main content

Cleveland to renovate Redcliffe Bridge

The iconic UK bascule bridge crossing Bristol city’s harbour was built in 1942.
By David Arminas March 19, 2021 Read time: 2 mins
The structure is a steel counterbalanced, single 15.5m-long leaf bridge with a 15.5m span (photo courtesy Bristol City Council)

Cleveland Bridge in the UK will renovate the city of Bristol’s Redcliffe Bridge, a bascule crossing of the harbour and which was built in 1942.
 
The iconic two-lane bridge, which links Redcliffe Way to the city centre, underwent a major electrical and control system refit in 1996. A full electrical and mechanical inspection was completed by CH2MHill - now part of Jacobs Engineering Group - in June 2017 with the intention to extend the life of the bridge by 20 years.
 
As principal contractor, Cleveland Bridge, along with Jacobs' design house, will start work likely in April. Work includes refurbishment of the internal steelwork and bridge parapet, water proofing of the bridge deck and mechanical and electrical modifications. Traffic gates and machinery will be replaced with rising-arm barriers.

“Alongside our proud reputation for building bridges in the UK and around the world we are also gaining a strong track record for rehabilitation projects, which is extending the life of important pieces of transport infrastructure such as the iconic Redcliffe Bridge,” said Chris Droogan, managing director of Cleveland Bridge.
 
According to the CH2MHill report, the structure is a steel counterbalanced, single 15.5m long leaf bridge with a 15.5m span. The bridge has not been regularly raised for several years renovation work will include make raising the bascule totally automatic unlike now where an operator must initiative consecutive phases of the raising.

Renovations costs have risen dramatically – 40 per cent - since last year, according to local media reports. Bristol City Council had budgeted £3 million (€3.5 million/US$4.2 million) to repair the bridge and was expecting to award a 16-month contract last September. But another £1.25million (€1.5 million/$1.75 million) has been added to the cost and work is expected to finish in March 2022, two months later than previously planned.

For more information on companies in this article

Related Content

  • US increased transportation budget proposals
    July 12, 2012
    IRF's Washington Programme Centre provides an update on some latest developments in the 2010 Budget plan There has been further recent action from both Congress and the White House on budget plans that will guide the Transportation Reauthorization Bill for the next six years. On 7 May, President Obama proposed large increases for rail and highways in his 2010 Budget plan, including the largest amount of funding that any President has sought for Amtrak, or for the development of high-speed rail in the Unite
  • US increased transportation budget proposals
    July 12, 2012
    IRF's Washington Programme Centre provides an update on some latest developments in the 2010 Budget plan There has been further recent action from both Congress and the White House on budget plans that will guide the Transportation Reauthorization Bill for the next six years. On 7 May, President Obama proposed large increases for rail and highways in his 2010 Budget plan, including the largest amount of funding that any President has sought for Amtrak, or for the development of high-speed rail in the United
  • Waste to road construction
    December 13, 2022
    In Australia, the use of waste materials in roads, including higher proportions of RAP, is gaining pace. Meanwhile, the industry in the US is looking to invest in net zero technologies
  • Caterpillar bullish with strong results
    July 30, 2018
    Caterpillar reports strong financial performance for sales in the second quarter of 2018. The firm's sales and revenues hit US$14 billion for the period, compared with $11.3 billion in the second quarter of 2017, a 24%. Second-quarter 2018 profit/share of $2.82 was a second-quarter record. Profit/share was $1.35 in the second quarter of 2017. Adjusted profit per share in the second quarter of 2018 was $2.97, compared with second-quarter 2017 adjusted profit/share of $1.49.