Skip to main content

Cleveland to renovate Redcliffe Bridge

The iconic UK bascule bridge crossing Bristol city’s harbour was built in 1942.
By David Arminas March 19, 2021 Read time: 2 mins
The structure is a steel counterbalanced, single 15.5m-long leaf bridge with a 15.5m span (photo courtesy Bristol City Council)

Cleveland Bridge in the UK will renovate the city of Bristol’s Redcliffe Bridge, a bascule crossing of the harbour and which was built in 1942.
 
The iconic two-lane bridge, which links Redcliffe Way to the city centre, underwent a major electrical and control system refit in 1996. A full electrical and mechanical inspection was completed by CH2MHill - now part of Jacobs Engineering Group - in June 2017 with the intention to extend the life of the bridge by 20 years.
 
As principal contractor, Cleveland Bridge, along with Jacobs' design house, will start work likely in April. Work includes refurbishment of the internal steelwork and bridge parapet, water proofing of the bridge deck and mechanical and electrical modifications. Traffic gates and machinery will be replaced with rising-arm barriers.

“Alongside our proud reputation for building bridges in the UK and around the world we are also gaining a strong track record for rehabilitation projects, which is extending the life of important pieces of transport infrastructure such as the iconic Redcliffe Bridge,” said Chris Droogan, managing director of Cleveland Bridge.
 
According to the CH2MHill report, the structure is a steel counterbalanced, single 15.5m long leaf bridge with a 15.5m span. The bridge has not been regularly raised for several years renovation work will include make raising the bascule totally automatic unlike now where an operator must initiative consecutive phases of the raising.

Renovations costs have risen dramatically – 40 per cent - since last year, according to local media reports. Bristol City Council had budgeted £3 million (€3.5 million/US$4.2 million) to repair the bridge and was expecting to award a 16-month contract last September. But another £1.25million (€1.5 million/$1.75 million) has been added to the cost and work is expected to finish in March 2022, two months later than previously planned.

For more information on companies in this article

Related Content

  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Second bascule bridge for Lowestoft
    December 10, 2020
    Total cost of the North Sea coastal project is around €160 million.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Kier picks up London tunnel deal
    February 1, 2021
    The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.