Skip to main content

Balfour extends Lincolnshire maintenance deal

The €385 million highways maintenance contract is a six-year extension from Lincolnshire County Council in England.
By David Arminas December 7, 2023 Read time: 2 mins
The recently installed highways maintenance operational control hub for Balfour’s client Lincolnshire County Council (image courtesy Balfour Beatty Living Places)

Balfour Beatty Living Places has been awarded a €385 million (£330 million) six-year extension to its highways maintenance contract with Lincolnshire County Council in England.

The extension builds on the current six-year contract which ends in 2026. The new deal will run until spring 2032. It covers The council’s 9,240km of carriageways, provide drainage cleaning services as well as winter and reactive highways maintenance such as gritting, road repairs and traffic management.

The company said the contract will continue to employ 183 people, including 10 apprenticeship and graduate positions as part of Balfour Beatty’s commitment to the 5% Club. By joining the 5% Club, employers seek to achieve 5% of their workforce in earn-and-learn positions. These include apprentices, sponsored students and graduates who, within five years of joining the company, have a formalised training scheme.

Balfour said it will use its operational control hub, which came on line earlier this year, to monitor all activities in real-time and drive efficiencies across the local road network. Steve Helliwell, managing director of Balfour Beatty Living Places, said the hub serves as a platform for teams to promptly address network issues, facilitating real-time digital planning. It empowers efficient organisation of both reactive and emergency works, along with streamlined defect reporting in a dynamic digital environment.

“Today’s announcement will see us continue to provide a best-in-class highways maintenance service,” said Helliwell, “while offering customer-focused solutions in a collaborative partnership and leaving a lasting positive legacy for the communities we serve.”

For more information on companies in this article

Related Content

  • New Holland 'space savers'
    February 15, 2012
    Zero tailswing excavators from New Holland are part of a plant deal won by civil engineering contractor K Rouse with Balfour Beatty. The machines, 11 E135BSRs and two smaller models, the E80 and E50, are being used on a section of the M621 motorway near the city of Leeds, northern England, to remove existing metal crash barriers and install improved drainage prior to the erection of a new concrete central reservation.
  • Developments in minimising construction defects
    February 27, 2012
    Egis has an innovative approach to addressing construction defects - *Martin O’Flaherty, Jean Pohu. Defects often become apparent after construction projects are handed over to the client and this is a common problem across most highway projects. The problem is shared by highway operators who have assumed the responsibility of managing such projects.
  • CS involved in two tolling and ITS projects in Poland
    May 14, 2012
    French company CS Communication & Systèmes has announced it has delivered the Poland A1 Phase 2 tolling and ITS project two months ahead of schedule. Earlier this year, Intertoll, the prime contractor of the project, asked CS to accelerate the project that was initially expected to be completed on 21 December, 2011. The scope of this project included the design, supply, installation and maintenance of six toll plazas, 16 automated entry lanes and 23 manual exit lanes. CS also designed and installed a full I
  • AIA’s UK ‘crumbling roads’ survey prompts call for greater Government funding
    March 14, 2013
    The annual national survey of UK local road network condition and funding claims there is a crumbling road crisis of increasing concern, prompting renewed calls for increased and longer term Government funding. Commissioned by the Asphalt Industry Alliance (AIA), the 18th Annual Local Authority Road Maintenance (ALARM) Survey was completed by 75% of councils across England and Wales and reports that the number of potholes filled over the last year rose to over two million - an increase of 29% on the previou