Skip to main content

Training programmes in Oman

A German firm is helping increase output for construction sites in Oman. The company is providing training for a range of different machine types, aiming to reduce the risk of operator errors or machine downtime while optimising productivity, efficiency and profitability. Probst Greiftechnik Verlegesysteme is sending its service technicians around the world to provide training on proper operation and maintenance to dealers and end customers. During individual training sessions, the machine operators can
May 19, 2015 Read time: 3 mins
The trainees undergo intensive tuition with a range of equipment
A German firm is helping increase output for construction sites in Oman. The company is providing training for a range of different machine types, aiming to reduce the risk of operator errors or machine downtime while optimising productivity, efficiency and profitability.

Probst Greiftechnik Verlegesysteme is sending its service technicians around the world to provide training on proper operation and maintenance to dealers and end customers. During individual training sessions, the machine operators can look over the shoulder of the Probst service technician and gain experience under supervision. They receive lots of hints and tips, beginning with how to determine the optimal starting point for laying paving stones at a site; moving on to positioning of the pallets; and extending to replacing stones so that they interlock properly.

Possible troubleshooting scenarios are practiced, such as why stones are slipping out of the grab. Solutions are provided and in this instance (pictured right), showing that the grab is gripping too high up and has to be readjusted. Other training tasks include safe loading and unloading as well as maintenance of the machine. According to Probst, experience has shown that the personal introduction to new equipment results in much faster acceptance by the workforce. This avoids the risk of new tools and machines going unused due to apprehension about the new technology from personnel. Probst says that this also avoids operator errors and helps personnel transition from using familiar old tools or even manual methods.
After completing the intense training, all successful participants receive a certificate, which certifies their newly obtained qualifications. The graduates at Allied Business Corporation (ABCON) in Oman were amongst those to receive their Probst certificates recently. Over the four-day course, the employees there received in-depth training on optimal use of the VM-301-PAVERMAX installation machine. The parking lot of a hotel was being built and was used as a site for the training. Further Probst equipment was also used on the site in addition to the heavy equipment, with training provided on its use as well. The Block Cutters AL was used to trim the paving stones at the end of the parking lot, and any damaged individual stones could be removed from the pavement quickly and easily with the SZ Paving Block Extractor.

The mission abroad is also important for Probst as the service technicians experience specific challenges in the respective countries at first-hand, and this information is passed on directly to the development department when they return. For example, large radiators are now being fitted to machines for sale in the Middle East so that they can maintain reliability even in subtropical countries.

Related Content

  • World of Asphalt/AGG1 Aggregates Forum & Expo
    March 14, 2012
    World of Asphalt 2012 and the co-located AGG1 Aggregates Forum & Expo will be the largest in the history of the two events. Guy Woodford reports on some of the technology and equipment set to be on show. With over 6,500m² of exhibit space available, World of Asphalt 2012 (WoA) is among the global showpiece events of the year for all asphalt, pavement maintenance and traffic safety industry professionals.
  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division
  • bargain hunting, live onsite auction day in Donington, UK
    November 14, 2016
    It’s live onsite auction day in Donington, UK and it’s noisy. It’s also raining in early morning but that doesn’t put off the gathering crowd Buyers are milling around parked machinery. They kick tyres and slam doors. Some are behind the wheel, gingerly nudging vehicles frontwards and backwards or raising and lowering booms. Their partners stand a few metres away scrutinising the machine’s movements.
  • Muscat Airport contract for Cooper
    February 9, 2012
    A huge project in Oman will see a proposed new terminal at Muscat International Airport, which has been budgeted at US$1.17 billion, completed by 2014. It will have the capacity to handle 12 million passengers annually, and further expansions planned by The Ministry of Transport and Communication in three subsequent phases will ultimately boost the airport’s capacity to 48 million passengers annually by 2050.