Skip to main content

Training programmes in Oman

A German firm is helping increase output for construction sites in Oman. The company is providing training for a range of different machine types, aiming to reduce the risk of operator errors or machine downtime while optimising productivity, efficiency and profitability. Probst Greiftechnik Verlegesysteme is sending its service technicians around the world to provide training on proper operation and maintenance to dealers and end customers. During individual training sessions, the machine operators can
May 19, 2015 Read time: 3 mins
The trainees undergo intensive tuition with a range of equipment
A German firm is helping increase output for construction sites in Oman. The company is providing training for a range of different machine types, aiming to reduce the risk of operator errors or machine downtime while optimising productivity, efficiency and profitability.

Probst Greiftechnik Verlegesysteme is sending its service technicians around the world to provide training on proper operation and maintenance to dealers and end customers. During individual training sessions, the machine operators can look over the shoulder of the Probst service technician and gain experience under supervision. They receive lots of hints and tips, beginning with how to determine the optimal starting point for laying paving stones at a site; moving on to positioning of the pallets; and extending to replacing stones so that they interlock properly.

Possible troubleshooting scenarios are practiced, such as why stones are slipping out of the grab. Solutions are provided and in this instance (pictured right), showing that the grab is gripping too high up and has to be readjusted. Other training tasks include safe loading and unloading as well as maintenance of the machine. According to Probst, experience has shown that the personal introduction to new equipment results in much faster acceptance by the workforce. This avoids the risk of new tools and machines going unused due to apprehension about the new technology from personnel. Probst says that this also avoids operator errors and helps personnel transition from using familiar old tools or even manual methods.
After completing the intense training, all successful participants receive a certificate, which certifies their newly obtained qualifications. The graduates at Allied Business Corporation (ABCON) in Oman were amongst those to receive their Probst certificates recently. Over the four-day course, the employees there received in-depth training on optimal use of the VM-301-PAVERMAX installation machine. The parking lot of a hotel was being built and was used as a site for the training. Further Probst equipment was also used on the site in addition to the heavy equipment, with training provided on its use as well. The Block Cutters AL was used to trim the paving stones at the end of the parking lot, and any damaged individual stones could be removed from the pavement quickly and easily with the SZ Paving Block Extractor.

The mission abroad is also important for Probst as the service technicians experience specific challenges in the respective countries at first-hand, and this information is passed on directly to the development department when they return. For example, large radiators are now being fitted to machines for sale in the Middle East so that they can maintain reliability even in subtropical countries.

Related Content

  • A history lesson in private public partnerships
    April 12, 2012
    Michel Démarre gives some historical insights into public-private partnerships conceived to implement urban infrastructure projects, a concept that surprisingly dates back to as early as the 13th century! All over the world today, the role of public authorities in the process of planning and, in most cases, designing, financing and procuring urban roads is paramount. Even for modifications to existing roads, decisions are made by these public authorities (usually after due consultation with the population)
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Nigeria’s Eko Atlantic project: a city on the sea
    September 27, 2013
    Imagine a megapolis rising, Atlantis-like, from the sea. An urban development similar in size to New York’s Manhattan that boasts thriving business and residential districts to help transform not just a city but an entire country. It sounds like the stuff of science fiction. But the Eko Atlantic project in Lagos, Nigeria, is real and has become one of the most dazzling and most discussed construction developments in the entire world. One hundred years ago, the area of land on which the new city will be bu
  • Sri Lanka is suffering a worrying increase in road accidents and road related fatalities
    April 19, 2012
    The latest data from Sri Lanka reveals a massive rise in road accidents and the deaths. Finding the root cause is not straightforward however and may be many complex causes for this scenario. Key factors have been identified by local experts however and these include reckless driving without adequate road discipline, the absence of an effective procedure for issuing driving licenses and a lack of any training procedures for drivers as well as other road users. Other key problems include deficiencies in the