Skip to main content

Training programmes in Oman

A German firm is helping increase output for construction sites in Oman. The company is providing training for a range of different machine types, aiming to reduce the risk of operator errors or machine downtime while optimising productivity, efficiency and profitability. Probst Greiftechnik Verlegesysteme is sending its service technicians around the world to provide training on proper operation and maintenance to dealers and end customers. During individual training sessions, the machine operators can
May 19, 2015 Read time: 3 mins
The trainees undergo intensive tuition with a range of equipment
A German firm is helping increase output for construction sites in Oman. The company is providing training for a range of different machine types, aiming to reduce the risk of operator errors or machine downtime while optimising productivity, efficiency and profitability.

Probst Greiftechnik Verlegesysteme is sending its service technicians around the world to provide training on proper operation and maintenance to dealers and end customers. During individual training sessions, the machine operators can look over the shoulder of the Probst service technician and gain experience under supervision. They receive lots of hints and tips, beginning with how to determine the optimal starting point for laying paving stones at a site; moving on to positioning of the pallets; and extending to replacing stones so that they interlock properly.

Possible troubleshooting scenarios are practiced, such as why stones are slipping out of the grab. Solutions are provided and in this instance (pictured right), showing that the grab is gripping too high up and has to be readjusted. Other training tasks include safe loading and unloading as well as maintenance of the machine. According to Probst, experience has shown that the personal introduction to new equipment results in much faster acceptance by the workforce. This avoids the risk of new tools and machines going unused due to apprehension about the new technology from personnel. Probst says that this also avoids operator errors and helps personnel transition from using familiar old tools or even manual methods.
After completing the intense training, all successful participants receive a certificate, which certifies their newly obtained qualifications. The graduates at Allied Business Corporation (ABCON) in Oman were amongst those to receive their Probst certificates recently. Over the four-day course, the employees there received in-depth training on optimal use of the VM-301-PAVERMAX installation machine. The parking lot of a hotel was being built and was used as a site for the training. Further Probst equipment was also used on the site in addition to the heavy equipment, with training provided on its use as well. The Block Cutters AL was used to trim the paving stones at the end of the parking lot, and any damaged individual stones could be removed from the pavement quickly and easily with the SZ Paving Block Extractor.

The mission abroad is also important for Probst as the service technicians experience specific challenges in the respective countries at first-hand, and this information is passed on directly to the development department when they return. For example, large radiators are now being fitted to machines for sale in the Middle East so that they can maintain reliability even in subtropical countries.

Related Content

  • Adavances in concrete vibration technology
    December 13, 2018
    The use of controlled frequency vibration (CFV) technology and its applications in construction continue to grow - *Paul Jaworski Controlled frequency vibration (CFV) technology has been around since the mid-1990s for concrete pavement applications. The technology has seen a gradual increase in acceptance, particularly in certain applications. For the 0-37mm (1.5”) slump pavement mix designs, many contractors were experiencing material separation due to speeds over 8,000vibrations/minute (VPM). With the wi
  • Amey chooses polystyrene blocks for Scottish tunnel infill
    June 25, 2018
    Amey recently completed an infill project to make safe a disused railway tunnel underneath the approach roads north of Scotland’s Forth Road Bridge. The 420m tunnel was part of the Dunfermline to North Queensferry railway line that provided a link to the ferry service until the opening of the Forth Bridge in 1890. The 4.3m-wide and 5.1m-high tunnel with vaulted roof and brick lining continued in use for freight until 1954. The tunnel runs underneath the A9000 and B981 on the northern approach to the Forth
  • New transport event scheduled for Oman
    April 23, 2013
    An important transport infrastructure event is being held in Oman from the 8th-11th September 2013 at the Grand Hyatt hotel in Muscat. The Oman Land Transport Infrastructure Summit is being run as an information sharing, business event aimed at the country’s growing infrastructure development and rise in transport regulations. Oman Land Transport Infrastructure is a platform discussing the current traffic, transport and infrastructure challenges faced with the design and construction of roads, bridges and h
  • Efficient tunnelling
    May 13, 2024
    Liebherr's new tunnelling machine offers high production capacity and safety.