Skip to main content

German Joh. Sahler contractor goes down the Hitachi route

German contractor Joh. Sahler has changed its entire fleet of construction machinery to Hitachi Zaxis excavators. The two ZX38U-5s, ZX48U-3, ZX85USBLC-5, ZX145W-3, ZX170W-5 and ZX190W-3 were ordered by the Leverkusen-based company in June last year and delivered by the country’s authorised Hitachi dealer, Kiesel. Joh. Sahler was founded in 1945 and is now owned by a third-generation family member, Antonius Eisbach, and managed on a day-to-day basis by directors Dietmar Müller and Matthias Schindler.
April 30, 2015 Read time: 3 mins
German contractor Joh. Sahler has changed its entire fleet of construction machinery to Hitachi Zaxis excavators. The two ZX38U-5s, ZX48U-3, ZX85USBLC-5, ZX145W-3, ZX170W-5 and ZX190W-3 were ordered by the Leverkusen-based company in June last year and delivered by the country’s authorised Hitachi dealer, Kiesel.

Joh. Sahler was founded in 1945 and is now owned by a third-generation family member, Antonius Eisbach, and managed on a day-to-day basis by directors Dietmar Müller and Matthias Schindler. It has a team of 50 employees who work on road and sewer construction projects for mostly privately owned clients but also some public sector customers.

All of the new machines are supported by a five-year maintenance and service package provided by 233 Hitachi Support Chain and managed by 7050 Kiesel. “Kiesel contacted us at exactly the right time at the end of 2013, when we first considered changing all of our machines,” said Matthias.

“We wanted to buy established products that our customers would recognise and feel comfortable with. These machines need to be reliable and work well for at least five years and that is why we have invested in the after-sales package.”

The two-piece boom Hitachi ZX170W-5 wheeled excavator is the largest Zaxis-5 machine at Joh. Sahler’s disposal. It was delivered in July and one of its first assignments was a road construction project near Leverkusen. The €450,000 contract to build a roundabout started at the end of September and was scheduled to finish in December. The ZX170W-5 was the only wheeled excavator on the 3,400m² site, which includes 1,500m² of new road, 100m² of new foot and cycle paths and streetlights and the planting of trees.

“The ZX170W-5 is suited to this type of work, and along with the ZX145W-3 and ZX190W-3, we have a range of wheeled excavators to cover the full scale of our operations,” said Matthias. “It is a classic machine for working on roads, as it is fast and versatile, and can be used on and off road. We’re very happy with our current line-up of machines because our maintenance costs are lower than before and there is minimal downtime.”

“I’m really happy with the overall performance of the ZX170W-5,” explained the ZX170W-5’s operator Mario Tietje, who has been with the company for 30 years. “The cab has more than enough space and a comfortable seat, which is important when working on site for the whole day. It is perfectly suited to this type of road construction work and the best feature is the hydraulics, which work quickly and ensure that the machine is easy to operate.”

For more information on companies in this article

Related Content

  • Komatsu Europe introduces new WA700-8 wheeled loader with enhanced safety, cost-per-tonne, and emissions levels
    April 11, 2025

    Komatsu has unveiled the all-new WA700-8 wheeled loader, which the manufacturer says delivers increased productivity, exceptional durability, and impeccable environmental credentials.

    Before commencing development, Komatsu engineers actively collected customers’ input, identifying that safety, cost-per-tonne produced, CO2 emission, maximising uptime, and operator well-being were the key concerns of customers.  

  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un
  • Hail! Roman Watling Street section unearthed!
    November 15, 2024
    The very well preserved section of the old Roman Watling Street near London, UK, is the first physical proof that parts of the 2,000-year-old route survive directly beneath its modern counterpart, Old Kent Road.
  • Plain sailing for Caterpillar’s PM 300 series
    February 22, 2019
    Caterpillar’s revamped small cold planers have upped the stakes in the urban refurbishing market. World Highways deputy editor David Arminas recently caught up with A.J. Lee, global segment manager, on Spain’s Costa del Sol