Skip to main content

Advanced grouting system meets specification

As engineers write tighter and tighter specifications for grouting, so equipment manufacturers must develop solutions which can help contractors meet those specifications, and prove that they have met them Atlas Copco's new mobile grouting system, Unigrout Smart A, has been designed to do just that: it can mix, pump, monitor, log and control flow and pressure precisely. The control system allows on site mixing of a range of grouts as required by the project.
May 2, 2012 Read time: 2 mins
A sophisticated grouting solutions is available from Atlas Copco

As engineers write tighter and tighter specifications for grouting, so equipment manufacturers must develop solutions which can help contractors meet those specifications, and prove that they have met them

161 Atlas Copco's new mobile grouting system, Unigrout Smart A, has been designed to do just that: it can mix, pump, monitor, log and control flow and pressure precisely.

The control system allows on site mixing of a range of grouts as required by the project.

The quantities of water and cement are weightbatched and delivered to the coilloidal mixer, a type of mixer which uses a high velocity blade to shear or separate grout particles, breaking surface tension and enabling complete contact between the particles and the water. From there it moves to an agitator until it is called for by the pump.

The Unigrout Smart A has a dual-pump system. As well as its established Pumpac piston pump which controls pressure and flow independently it also has the facility to operate with a progressive cavity pump, a type of pump specified by US federal regulations for grouting.

The computerised recording system samples and stores flow, volume, pressure and pumping time from up to four lines at once. The information can then be transferred to a PC for reporting purposes.

For more information on companies in this article

Related Content

  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.
  • Bentley is building its software solutions portfolio
    May 14, 2015
    Bentley Systems continues to develop its portfolio of software solutions - Mike Woof writes One of the leaders in the field of construction software, Bentley Systems is developing its array of solutions for industry users. The company is growing both by acquisition and organically, using its financial strength to buy up smaller niche firms as well as developing the capabilities of its in-house software further. The company has recently made three key acquisitions, for EADOC, Acute3D and C3global. The
  • Using aspahlt testing equipment improves efficiency
    May 28, 2013
    From density tests on a Mongolian gold mine project to an all-singing, all-dancing asphalt tester, Kristina Smith reports on some of the latest new products in materials testing. Perhaps understandably, nuclear density gauges can present contractors with some order to move them at all. “One of the problems with nuclear soil gauges is the restrictions on movement,” said John Lamond, Manufacturing. “If you are a contractor projects cross-border, it’s a real challenge to move a nuclear density gauge around.”
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau