Skip to main content

Bangladesh, China seal $705 million deal for Karnaphuli River tunnel

Bangladesh has formally signed a US$705 million deal with China Communication Construction to build a multi-lane road tunnel underneath the Karnaphuli River in Chittagong. Road Transport and Bridges secretary Man Siddique along with the government’s Road Transport and Bridges minister Obaidul Quader signed the contract with Liu Qitao, chairman of China Communication Construction. The signing took place in Beijing, according to a report in the Bangladesh newspaper The Independent.
July 2, 2015 Read time: 2 mins

Bangladesh has formally signed a US$705 million deal with China Communication Construction to build a multi-lane road tunnel underneath the Karnaphuli River in Chittagong.

Road Transport and Bridges secretary Man Siddique along with the government’s Road Transport and Bridges minister Obaidul Quader signed the contract with Liu Qitao, chairman of China Communication Construction.

The signing took place in Beijing, according to a report in the Bangladesh newspaper The Independent.

On June 9 last year, Bangladesh and China signed a memorandum of understanding for construction of the tunnel which has been hit by rising cost estimates.

But in April this year, the Financial Express newspaper reported that the construction cost of the tunnel had risen by $205 million, according to the government’s Bridge Authority.

The Financial Express newspaper also said the original 2km tunnel proposal was prepared two years ago based on a feasibility study. According to Bridge Authority officials, the cost to build the tunnel – now 3.4km - has risen 8% a year and it is expected to grow further on the preparation of the project design.

The Karnaphuli River divides the Chittagong district and three bridges already serve the region. But traffic growth is putting pressure on the infrastructure, according to the website of the Bridge Authority.

Chittagong at the mouth of the river is Bangladesh’s main sea port and largest commercial city that sees most of the country’s export and import activities. The tunnel would connect directly with the Dhaka-Chittagong-Cox Bazar Highway.

Width of the river at the site of the proposed tunnel is 700m and the water depth is between 9-11m. The indicative length of the proposed Tunnel is 2000 meters.

Related Content

  • Bangladesh bridge contract proposal
    July 24, 2019
    A Chinese contractor is expressing interest in building a major bridge connection in Bangladesh.
  • Chinese Harbor Engineering closes in on Dhaka-Sylhet road deal
    September 21, 2016
    The Bangladeshi government is expected to award the Dhaka-Sylhet road contract to Chinese Harbor Engineering. The 226km project will cost around US$1.6 billion and turn the road into a four-lane highway, according to a report by the Dhaka Tribune newspaper. Chinese Harbor Engineering is also expected to win the $2.8 billion construction contract for Marine Drive Expressway. The newspaper said that the government has been asking China to provide financial assistance for 18 projects costing more than
  • Progression with Bangladesh elevated highway
    June 8, 2016
    Plans are in hand for a radical new 225km raised highway to connect Bangladeshi capital Dhaka with the city of Chittagong. An elevated highway design is required due to the low-lying terrain along the country’s coast where the highway would run, as the area is prone to frequent flooding. However raising the roadway is also boosting the cost of the project substantially. The work is likely to cost in the region of US$8.91 billion according to estimates. As a result, the Bangladesh Government is having had to
  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel