Skip to main content

Bangladesh, China seal $705 million deal for Karnaphuli River tunnel

Bangladesh has formally signed a US$705 million deal with China Communication Construction to build a multi-lane road tunnel underneath the Karnaphuli River in Chittagong. Road Transport and Bridges secretary Man Siddique along with the government’s Road Transport and Bridges minister Obaidul Quader signed the contract with Liu Qitao, chairman of China Communication Construction. The signing took place in Beijing, according to a report in the Bangladesh newspaper The Independent.
July 2, 2015 Read time: 2 mins

Bangladesh has formally signed a US$705 million deal with China Communication Construction to build a multi-lane road tunnel underneath the Karnaphuli River in Chittagong.

Road Transport and Bridges secretary Man Siddique along with the government’s Road Transport and Bridges minister Obaidul Quader signed the contract with Liu Qitao, chairman of China Communication Construction.

The signing took place in Beijing, according to a report in the Bangladesh newspaper The Independent.

On June 9 last year, Bangladesh and China signed a memorandum of understanding for construction of the tunnel which has been hit by rising cost estimates.

But in April this year, the Financial Express newspaper reported that the construction cost of the tunnel had risen by $205 million, according to the government’s Bridge Authority.

The Financial Express newspaper also said the original 2km tunnel proposal was prepared two years ago based on a feasibility study. According to Bridge Authority officials, the cost to build the tunnel – now 3.4km - has risen 8% a year and it is expected to grow further on the preparation of the project design.

The Karnaphuli River divides the Chittagong district and three bridges already serve the region. But traffic growth is putting pressure on the infrastructure, according to the website of the Bridge Authority.

Chittagong at the mouth of the river is Bangladesh’s main sea port and largest commercial city that sees most of the country’s export and import activities. The tunnel would connect directly with the Dhaka-Chittagong-Cox Bazar Highway.

Width of the river at the site of the proposed tunnel is 700m and the water depth is between 9-11m. The indicative length of the proposed Tunnel is 2000 meters.

Related Content

  • Costs cut for key Bangladesh highway project
    April 12, 2017
    The cost of a major highway project being carried out in Bangladesh has been reduced significantly. The 192km highway connecting capital Dhaka with Chittagong will now cost US$427.8 million, instead of the $$475.1 million originally expected. Reductions in the costs of materials have helped lower the overall pricetag for the project, while the fact that the work has remained within schedule means there has been no need for the contingency funds that were forecast. The highway is expected to open to traffic
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.
  • Smaller contractors wanted for Melbourne’s North East Link project
    September 27, 2018
    Australia’s Victoria state government has moved to ensure smaller contractors get a share of the US$12 billion worth of Melbourne city’s North East Link contracts. According to a report in the Australian Financial Review, Victoria state treasurer Tim Pallas said that consortiums bidding for North East Link could not include more than one of the top three local contractors. This is to encourage more international companies and smaller Australian contractors to tender for the proposed 26km project.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp