Skip to main content

Innovative road/drainage tunnel plan for Jakarta

An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The
February 16, 2015 Read time: 2 mins
RSSAn innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The plan calls for the tunnels to be complete in three years. One of the tunnels will link Tanah Abang with Ulujami and the other will connect Manggarai with Bale Kambang.

The project is similar in concept at least to the 5333 Stormwater Management and Road Tunnel's (SMART) section constructed in Malaysian capital Kuala Lumpur some years ago. Like Jakarta, Kuala Lumpur also suffers from heavy rainfall at times and the two cities share similar climactic conditions. With a heavy focus on vehicle traffic for transportation, congestion was an issue in Kula Lumpur and the city authorities decided to tackle two issues in one by construction the SMART project. Jakarta’s traffic congestion is also a major problem.

For most of the time Kuala Lumpur’s SMART link operates as a dual deck road tunnel, providing an express route for traffic under the city. But during periods of heavy rain, its road decks are closed to cars and carry. The SMART tunnel is 9.8km long and its central 3km carries out the dual role, with traffic carried on two decks. Floodwater can be carried in the lowest portion of the tunnel, beneath the lower road deck. The road decks are protected from flooding to maximise safety and can also be closed to traffic and opened to flood flows when the water levels are particularly high.

Those involved in building the project in Jakarta stand to learn a lot from how the SMART link was constructed in Kuala Lumpur as it went, broadly speaking, to plan. Despite geological and technical challenges, the tunnel was constructed within the planned two year period and $464 million budget, without major incident.

For more information on companies in this article

Related Content

  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • Mexico cutting motorway budget
    February 23, 2015
    Mexico is cutting its planned motorway construction budget. The country's Secretariat for Transport and Communications (SCT) has said the budget will be cut by US$268.8 million, a reduction of 17% from the figure planned originally. The 130 different projects that were to have been carried out under the original budget will still be built, but a number may be delayed. Road construction has been a key priority for this government in Mexico. In all some 46 new motorways will have been constructed by the prese
  • Brenner Tunnel financing solution suggested
    March 20, 2015
    The Brenner Base Tunnel could be financed by highway users according to a proposal by the Italian Ministry of Transport. The authorities in South Tyrol have suggested that the EU may forego new tenders and recalculate the concession period so that it is for a longer timeframe. This would be of benefit both to the Italian Government (which has budgetary restraints), and the EU. Highway operator Brennerautobahn, in which the Italian regions of Trentino and South Tyrol have a 32.2% stake, already provides €30
  • Virginia cancels Ferrovial road contract for US460 construction
    May 6, 2015
    The Transport Department of the State of Virginia in the US plans to cancel a contract worth an estimated US$1.12 billion for road construction awarded to Spanish firm Ferrovial. The deal ends 15 June and the two parties are negotiating compensation terms for Ferrovial which won the contract in October 2012 for US-460. . Work was to begin in 2014 and finish in 2018 but no construction has taken place. The road, awarded in consortium with American Infrastructure, was to be 88.5km and run between the c