Skip to main content

Innovative road/drainage tunnel plan for Jakarta

An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The
February 16, 2015 Read time: 2 mins
RSSAn innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The plan calls for the tunnels to be complete in three years. One of the tunnels will link Tanah Abang with Ulujami and the other will connect Manggarai with Bale Kambang.

The project is similar in concept at least to the 5333 Stormwater Management and Road Tunnel's (SMART) section constructed in Malaysian capital Kuala Lumpur some years ago. Like Jakarta, Kuala Lumpur also suffers from heavy rainfall at times and the two cities share similar climactic conditions. With a heavy focus on vehicle traffic for transportation, congestion was an issue in Kula Lumpur and the city authorities decided to tackle two issues in one by construction the SMART project. Jakarta’s traffic congestion is also a major problem.

For most of the time Kuala Lumpur’s SMART link operates as a dual deck road tunnel, providing an express route for traffic under the city. But during periods of heavy rain, its road decks are closed to cars and carry. The SMART tunnel is 9.8km long and its central 3km carries out the dual role, with traffic carried on two decks. Floodwater can be carried in the lowest portion of the tunnel, beneath the lower road deck. The road decks are protected from flooding to maximise safety and can also be closed to traffic and opened to flood flows when the water levels are particularly high.

Those involved in building the project in Jakarta stand to learn a lot from how the SMART link was constructed in Kuala Lumpur as it went, broadly speaking, to plan. Despite geological and technical challenges, the tunnel was constructed within the planned two year period and $464 million budget, without major incident.

For more information on companies in this article

Related Content

  • Investment in Indonesia
    May 22, 2012
    The authorities in Indonesia are planning six toll road projects to link with capital Jakarta. These have a total value of US$4.52 billion and include the 18km Semanan-Sunter toll road, a 10km road linking Kampung Melayu and Kemayoran, the 9.6km Pasar Minggu-Casablanca road and the Ulujami-Tanah Abang road. Prequalification for tendering will commence once full approval has been given for the projects to become part of Jakarta’s 2011-2030 infrastructure programme. Also in Indonesia, Jasa Marga is investing
  • Traffic control solution manufacturers win key project works
    September 26, 2013
    Traffic control system manufacturers have recently supplied some of their cutting-edge technology to major projects in Europe. Meanwhile, in southern Asia, another leading firm in the sector is helping reduce chronic traffic congestion in Indonesia’s capital, Jakarta. Guy Woodford reports Solutions supplied by Siemens Mobility & Logistics (M&L) are helping the Rijkswaterstaat improve traffic conditions at the Coentunnel in Amsterdam, one of the most heavily used traffic arteries in the Netherlands, used
  • Long term improvement in Malaysian road safety observed
    December 10, 2014
    The latest official data from Malaysia reveals a general, long-term improvement in road safety. In capital Kuala Lumpur, the road fatality rate has dropped by close to 50% in the 10 year period from 2004 to 2014. In 2013, the road fatality rate stood at at 0.44% of the 1.88 million population in the city, compared with 0.83% of the 1.52 million population recorded in 2004. During January-October 2014, the car crash rate and fatality rate in the city was reported to drop by 289 cases and seven cases respecti
  • Indonesia’s mega road plans to include tolling -
    December 4, 2012
    The Ministry of Public Works in Indonesia has allocated US$5.33 billion (IDR 50.35 trillion) for a development master plan set to include improvements to vital access and toll roads. Among the projects in the Acceleration and Expansion of Economy Development master plan up until 2014 are access roads from Nabire to Narotali; from Manokwari to Sorong in Papua; from Sei Mangke to Kuala Tanjung in North Sumatra; and from Tanjung Priok to the Metropolitan Priority Area. It also includes the Cileunyi-Sumedang-Da