Skip to main content

Haulotte wraps it up at Turkey’s Osman Gazi Bridge

French access group Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge. The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central
July 5, 2016 Read time: 2 mins
French access group 712 Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge.

The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central span – 1,550m.

The Osman Gazi Bridge is part of the partially completed tolled motorway Gebze-Orhangazi-İzmir Highway project, costing around US$9 billion. The 433km highway runs south from Gebze, a city about 50km east of Istanbul and on the north coast of the sea of Marmara, to the city of Bursa and then further south to the Aegean coastal city of İzmir, an industrial hub and tourist destination. It will cut the travel time between Istanbul and İzmir from nine hours to three-and-a-half. Construction started in 2013 and many of Haulotte’s electric and diesel scissors have helped build the bridge’s superstructure, such as installing and fixing steel beams. Several units of the rough terrain articulating boom HA41PX-NT were involved in the work.

Meanwhile, Haulotte recently opened a North American headquarters in the city of Virginia Beach, in the state of Virginia.

The 7,711m2 facility supports the company’s executive offices, customer sales and service support, training centre and distribution of spare parts and finished goods. Additionally, the customer care centre will oversee parts fulfillment, warehousing, pre-delivery inspections and repairs. The previous Maryland facility was roughly 1,300m2.

For more information on companies in this article

Related Content

  • Egis has been awarded a major Turkish highway deal
    June 25, 2013
    Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish
  • Marangoni expanding Turkish market presence
    March 7, 2018
    Tyre specialist Marangoni is making a strategic move of its Turkish operations to Istanbul. This development is aimed at improving the company’s share of the Turkish tyre retreading market. The Italian company is keen to further boost its worldwide market share. Marangoni Retreading Systems has announced a significant development for its Turkish business interests with the new warehouse and head office located in the country’s commercial centre, Istanbul. This move has been managed through its Turkish sub
  • Building a major Turkish highway project
    August 15, 2018
    The North Marmara Motorway Project in Turkey has been a major focus for project financing, as well as for novel technical solutions for its construction. This mega infrastructure project is intended to boost transport connectivity between the European and Asian sides of Turkey International law firm Winston & Strawn LLP has advised on major project financing for two sections of the highway. The structure for implementation of the Project is based on the build-operate-transfer (BOT) concession model. The
  • Haulotte introduces its high lift platform to North America
    January 6, 2017
    Haulotte is offering its high specification HT67 RTJ platform for the first time in the North American market. This telescoping boom platform is said to offer the best performance in its class and an unmatched working envelope at all levels. The machine is already proven in Europe, where it is marketed at the HT23RTJ. The machine offers a platform working height of 20.5m (67’) and a horizontal outreach of 18.3m (60’ 5”), which it claims is significantly more than its major competitors. Meanwhile load capaci