Skip to main content

Haulotte wraps it up at Turkey’s Osman Gazi Bridge

French access group Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge. The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central
July 5, 2016 Read time: 2 mins
French access group 712 Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge.

The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central span – 1,550m.

The Osman Gazi Bridge is part of the partially completed tolled motorway Gebze-Orhangazi-İzmir Highway project, costing around US$9 billion. The 433km highway runs south from Gebze, a city about 50km east of Istanbul and on the north coast of the sea of Marmara, to the city of Bursa and then further south to the Aegean coastal city of İzmir, an industrial hub and tourist destination. It will cut the travel time between Istanbul and İzmir from nine hours to three-and-a-half. Construction started in 2013 and many of Haulotte’s electric and diesel scissors have helped build the bridge’s superstructure, such as installing and fixing steel beams. Several units of the rough terrain articulating boom HA41PX-NT were involved in the work.

Meanwhile, Haulotte recently opened a North American headquarters in the city of Virginia Beach, in the state of Virginia.

The 7,711m2 facility supports the company’s executive offices, customer sales and service support, training centre and distribution of spare parts and finished goods. Additionally, the customer care centre will oversee parts fulfillment, warehousing, pre-delivery inspections and repairs. The previous Maryland facility was roughly 1,300m2.

For more information on companies in this article

Related Content

  • Poetry in motion
    August 9, 2018
    A heavy-lift operation by Roll-iT using Enerpac equipment delivered a bridge deck - with a poem engraved on the underside - to Antwerp’s old harbour Only when the deck of the new Londenbrug Bridge is raised do travellers see the poem by Antwerp poet Stijn Vranken. It is written large on the underside of the 300tonne prefabricated steel deck. People waiting for a ship to pass the raised bridge now contemplate the poem’s message about ships transporting goods and people to and from the four corners of the
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Haulotte Group sales up 13% in 2011 Q4
    March 2, 2012
    Haulotte Group (HG) increased its Q4 2011 sales by 13%, compared to the same period of 2010. The rise took consolidated October 1 to December 31 2011 sales to US$107.1million (€82.2 million) compared with $94.5million (€72.5million) in the same three months of last year.
  • Haulotte Group sales up 13% in 2011 Q4
    May 2, 2012
    Haulotte Group (HG) increased its Q4 2011 sales by 13%, compared to the same period of 2010. The rise took consolidated October 1 to December 31 2011 sales to US$107.1million (€82.2 million) compared with $94.5million (€72.5million) in the same three months of last year.