Skip to main content

Haulotte wraps it up at Turkey’s Osman Gazi Bridge

French access group Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge. The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central
July 5, 2016 Read time: 2 mins
French access group 712 Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge.

The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central span – 1,550m.

The Osman Gazi Bridge is part of the partially completed tolled motorway Gebze-Orhangazi-İzmir Highway project, costing around US$9 billion. The 433km highway runs south from Gebze, a city about 50km east of Istanbul and on the north coast of the sea of Marmara, to the city of Bursa and then further south to the Aegean coastal city of İzmir, an industrial hub and tourist destination. It will cut the travel time between Istanbul and İzmir from nine hours to three-and-a-half. Construction started in 2013 and many of Haulotte’s electric and diesel scissors have helped build the bridge’s superstructure, such as installing and fixing steel beams. Several units of the rough terrain articulating boom HA41PX-NT were involved in the work.

Meanwhile, Haulotte recently opened a North American headquarters in the city of Virginia Beach, in the state of Virginia.

The 7,711m2 facility supports the company’s executive offices, customer sales and service support, training centre and distribution of spare parts and finished goods. Additionally, the customer care centre will oversee parts fulfillment, warehousing, pre-delivery inspections and repairs. The previous Maryland facility was roughly 1,300m2.

For more information on companies in this article

Related Content

  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • New C10DX and C12DX join Haulotte’s INTERMAT 2012 line-up
    January 6, 2017
    Haulotte Group will be showing its full range of telehandlers including the new generation of its 10tonne and 12tonne rough-terrain scissor lifts, which will be launched at INTERMAT.
  • New C10DX and C12DX join Haulotte’s INTERMAT 2012 line-up
    February 3, 2012
    Haulotte Group will be showing its full range of telehandlers including the new generation of its 10tonne and 12tonne rough-terrain scissor lifts, which will be launched at INTERMAT.
  • Highway developments to boost east-west transport
    April 4, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports History was made in late 2010, when one of the biggest road building projects ever envisaged in Eastern Europe was given the green-light. It was the occasion when Russian president Dmitry Medvedev signed a law that would allow his country to build its segment of a huge highway around the Black Sea. The idea is to complete the 7,140km highway, wi