Skip to main content

Work to commence on new Philippines expressway

Work is due to commence in 2017 on the new Cavite-Laguna Expressway in the Philippines. This 47km route will run along the coast to the south of capital Manila, with its north eastern end lying close to the city’s international airport. The route connects Cavitex in Cavite's Kawit with the SLEx-Mamplasan Interchange in Laguna's Biñan. The project will improve connections to the airport as well as from Manila to the southern end of Luzon.
September 15, 2016 Read time: 2 mins
Work is due to commence in 2017 on the new Cavite-Laguna Expressway in the Philippines. This 47km route will run along the coast to the south of capital Manila, with its north eastern end lying close to the city’s international airport. The route connects Cavitex in Cavite's Kawit with the SLEx-Mamplasan Interchange in Laguna's Biñan. The project will improve connections to the airport as well as from Manila to the southern end of Luzon.

This will be one of the country’s largest PPP projects to date and is expected to cost around US$728 million. The project is being handled by a subsidiary of Metro Pacific Investments Corp (MPIC). Australian firm 2474 Leighton Holdings will build the north eastern end of the expressway and DMCI Consunji will build the south western end of the route. The construction work is expected to take until 2020 to complete while the concession period for the route runs until 2050.

For more information on companies in this article

Related Content

  • Philippines highway construction due to start
    August 10, 2018
    Construction will commence on the North Luzon Expressway (NLEX) connector road in the Philippines in early 2019.
  • Philippines expressway extension project planned
    January 19, 2017
    San Miguel (SMC) plans to extend the Skyway Stage 3 project in the Philippines. The link will measure close to 15km long and will provide a new route to and from eastern Metro Manila. The US$843.6 million project is intended to carry a high proportion of heavy vehicles, currently using other routes. This six lane stretch of elevated tollroad is being built to provide a link between the North Luzon Expressway (NLEx) and South Luzon Expressway (SLEx). The route of the new extension section looks likely to run
  • DMCI set to be involved in key Philippines expressways’ link project
    August 7, 2012
    DMCI Holdings (DMCI) of the Philippines, in partnership with the San Miguel Corporation, is expected to carry out a road project to link two major expressways in the country. The link is part of road projects valued at US$901.65 million (PHP 38 billion) that Metro Pacific Tollways intends to carry out over the next five years. DMCI was the contractor for the second phase of the 30km Metro Manila Skyway project, through its construction unit, DM Consunji. The second phase of the Skyway project involved build
  • Philippines expressway package awarded
    November 1, 2019
    The contract for a stretch of elevated expressway has been awarded in the Philippines. DM Consunji is the contractor that will carry out the construction work to build the NLEX-SLEX Connector Road Project Section 1. The firm will build 5km of the 8km route, with the contract worth US$429.7 million. The package of works was awarded by NLEX Corp and involves providing a new link road from Caloocan, connecting to C3 and to Espana Boulevard in capital Manila. Construction is expected to take 20 months and shoul