Skip to main content

Vietnam building major new bridge

In Vietnam work is now underway on the Bach Dang Bridge project. Costing some US$356.5 million, the new bridge will connect the Ha Noi-Hai Phong Highway and the Ha Long-Hai Phong Highway. The 25m wide bridge will measure some 3km long in all, spanning the Bach Dang River. Much of the funding for this construction project is being supplied by Quang Ninh Province People's Committee. The project is being carried out under the build-operate-transfer model by the Bach Dang Bridge BOT, in collaboration with SE of
February 2, 2015 Read time: 1 min
In Vietnam work is now underway on the Bach Dang Bridge project. Costing some US$356.5 million, the new bridge will connect the Ha Noi-Hai Phong Highway and the Ha Long-Hai Phong Highway. The 25m wide bridge will measure some 3km long in all, spanning the Bach Dang River. Much of the funding for this construction project is being supplied by Quang Ninh Province People's Committee. The project is being carried out under the build-operate-transfer model by the Bach Dang Bridge BOT, in collaboration with SE of Japan as well as a number of local subcontractors.

Related Content

  • Taiwanese firm building Vietnam road
    June 17, 2013
    A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construct
  • Quang Ninh agrees to SE's new draft for Bach Dang Bridge in Vietnam
    October 18, 2012
    Vietnam's Quang Ninh province has backed a new design proposed by Japanese developer SE Group for the 4.3km Bach Dang Bridge. The new design will change the original prestressed concrete bridge design to a steel cable-stayed bridge. The modification will lower the girder height, reduce the bridge length and alter the main span length. The altered draft is awaiting final approval from the authorities. SE Group has also requested to cut the expenses for the project to US $ 386 million from $ 483 million. The
  • Vietnam coast road project underway
    February 18, 2019
    Construction work has commenced on a new coast road project in Vietnam’s Thai Binh Province. The road will provide an important connection, improving transport between the ports at Hai Phong, Quang Ninh and Diem Dien and the Cat Bi International Airport. It will also connect to the Ninh Binh-Hai Phong-Quang Ninh expressway and improve links between the Thai Binh economic zone, industrial clusters in Thai Thuy and Thien Hai districts. The project is being carried out under the build-operate-transfer model an
  • Vietnam road infrastructure plans
    February 4, 2019
    New road and bridge links are being opened to drivers in Vietnam, boosting connectivity and transport for the country. The 60km Ha Long-Van Don expressway in Quang Ninh is now open to traffic, having cost around US$514.4 million to construct. The Ha Long-Van Don expressway links the Ha Long - Hai Phong - Hanoi expressway with Van Don Airport and was built by the BOT Bien Cuong Joint Stock Company. And the 47km road stretch connecting the Hanoi-Haiphong and Cau Gie-Ninh Binh expressways is also now open to