Skip to main content

Turkey: Drilling of Eurasia Tunnel complete

Drilling work on the Eurasia Tunnel connecting Istanbul's European and Asian sides has been completed. Total length of the tunnel will be 5.4km, of which 3.3km will run under the sea. At its deepest point, the tunnel will be around 106m deep, according to a report by Hurriyet newspaper. Completion of the whole project is expected in the first quarter of 2017. The cost of the project amounts to some US$1.2 billion, of which $960 million has come from investment banks. Upon completion, the tunnel wil
September 2, 2015 Read time: 1 min
Drilling work on the Eurasia Tunnel connecting Istanbul's European and Asian sides has been completed.

Total length of the tunnel will be 5.4km, of which 3.3km will run under the sea. At its deepest point, the tunnel will be around 106m deep, according to a report by Hurriyet newspaper.

Completion of the whole project is expected in the first quarter of 2017. The cost of the project amounts to some US$1.2 billion, of which $960 million has come from investment banks.

Upon completion, the tunnel will be managed by Eurasia Tunnel Operation, Construction & Investment for 24 years and five months.

After that, the tunnel's operational rights will be transferred to the state.

Related Content

  • Davao City tunnel work accelerated
    November 18, 2022
    The twin-tube 2.3km-long tunnel will be the longest in the Philippines and is being constructed by Filipino and Japanese engineers.
  • Deutz delivering financial strength
    November 8, 2017
    German engine firm Deutz is reporting strong financial performance for the first nine months of 2017. The latest results reveal a marked increase in new orders, revenue and EBIT and a significant improvement in free cash flow. The firm also believes it is well positioned for the future as its E-Deutz strategy has been accelerated by the recent acquisition of Torqeedo. The firm says that new orders rose by 25.5% to reach €1,173.8 million, compared with €935.3 million for the same period in 2016.
  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
  • Slovakia’s Cabinet to have final say on D4 Bratislava bypass
    February 9, 2016
    The government of Robert Fico has said it will decide the fate of the controversial €1 billion Bratislava bypass, the D4 motorway project, possibly ahead of a national parliamentary election next month. Fico, who also was prime minister from 2006-2010, was re-appointed after leading his Direction Social Democracy party (SMER-SD) to a landslide victory in the 2012 parliamentary election. His party won 83 seats and formed an absolute majority government, Slovakia’s first since 1989. Controversy continue