Skip to main content

Turkey: Drilling of Eurasia Tunnel complete

Drilling work on the Eurasia Tunnel connecting Istanbul's European and Asian sides has been completed. Total length of the tunnel will be 5.4km, of which 3.3km will run under the sea. At its deepest point, the tunnel will be around 106m deep, according to a report by Hurriyet newspaper. Completion of the whole project is expected in the first quarter of 2017. The cost of the project amounts to some US$1.2 billion, of which $960 million has come from investment banks. Upon completion, the tunnel wil
September 2, 2015 Read time: 1 min
Drilling work on the Eurasia Tunnel connecting Istanbul's European and Asian sides has been completed.

Total length of the tunnel will be 5.4km, of which 3.3km will run under the sea. At its deepest point, the tunnel will be around 106m deep, according to a report by Hurriyet newspaper.

Completion of the whole project is expected in the first quarter of 2017. The cost of the project amounts to some US$1.2 billion, of which $960 million has come from investment banks.

Upon completion, the tunnel will be managed by Eurasia Tunnel Operation, Construction & Investment for 24 years and five months.

After that, the tunnel's operational rights will be transferred to the state.

Related Content

  • India plans major infrastucture investment
    February 10, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports. On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt.
  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Wacker Neuson’s strong results reflect demand for small equipment
    November 12, 2015
    The latest financial results for Wacker Neuson reveal strong demand for compact construction machines. The firm has reported revenue in excess of €1 billion for the first nine months of 2015. This marks an increase in business activity compared to the same period last year and a record high for the group. In light of the downturn in key markets in the third quarter, the company revised its forecast for 2015 downwards. However, it still expects to achieve record revenue business levels for 2015.