Skip to main content

Troubles deepen for contractor Odebrecht

Brazilian contractor Odebrecht is facing serious issues with regards to projects in Colombia and Peru. In Colombia the contract to build the Ruta del Sol II highway, at present 54% complete, is being terminated. Odebrecht is one of the partners in the The Consorcio Estructura Plural Promesa de Sociedad Futura Concesionaria Ruta del Sol consortium that was carrying out the contract. The consortium partners have also agreed not to claim for any compensation. In Peru meanwhile there is increasing pressure
February 24, 2017 Read time: 2 mins
Brazilian contractor 1305 Odebrecht is facing serious issues with regards to projects in Colombia and Peru. In Colombia the contract to build the Ruta del Sol II highway, at present 54% complete, is being terminated. Odebrecht is one of the partners in the The Consorcio Estructura Plural Promesa de Sociedad Futura Concesionaria Ruta del Sol consortium that was carrying out the contract. The consortium partners have also agreed not to claim for any compensation.

In Peru meanwhile there is increasing pressure on Odebrecht as the firm has been embroiled in a complex legal case. The company is facing the possibility that its troubled IIRSA highway contract will be revised. When the project was first envisioned in 2004 it was expected to cost $1.43 billion but a string of revisions and extra works have seen the pricetag spiral by a colossal 257% to $4.14 billion. The Peruvian authorities are understandably less than satisfied over the situation. There are also concerns over apparent irregularities with the contract, which are currently being investigated.

For more information on companies in this article

Related Content

  • Costa Rican highway under scrutiny
    May 3, 2012
    Investigations are in hand in Costa Rica over a series of faults on the highway linking capital San Jose with Caldera. The US$230 million highway has suffered surface cracking in certain stretches, while a number of landslides have also occurred along the route that have required clearing and for repairs to be made. Costa Rica's authorities are investigating Autopistas del Sol following allegations of corruption with regard to the San Jose to Caldera highway project. The investigations are looking at the co
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • ERIC 2016: What shape the ‘Smart Road’?
    February 7, 2017
    Optimism about the future of highways worldwide abounded at the inaugural European Road Infrastructure Conference (ERIC) in Leeds, UK Around 500 delegates passed through the varied sessions during the three-day event at the Royal Armouries Museum in the northern English city of Leeds. They came away with many visions of what a motorway and road could look like. But what speakers at the event - co-organised by the Brussels-based European Union Road Federation (ERF) and the UK’s Road Safety Markings Ass
  • A pothole damage breakthrough?
    April 11, 2013
    Academic research by two universities in the same UK city shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. Guy Woodford reports. Repairing pothole damage to highways and vehicles across Europe costs responsible authorities and individual motorists hundreds of millions of euros each year. Yet it has cost just €20,204 to make the potentially crucial first step in identifying a method of keeping highways across the continent and beyond pothole fr