Skip to main content

Tenders and financing for Serbian highways

The Serbian Government is considering a loan from China’s Export-Import Bank, which would pay for the construction of the E-763 highway. The bank looks set to give its approval for the €223 million loan, which would pay for 90% of the construction work for the E-763, or Obrenovac-Ljig, highway. The loan would be approved over a 20 year repayment period and a five year grace period at the fixed rate of 2.5%/year. Meanwhile tendering will open for completion works on Serbia’s Pirot-Dimitrovgrad highway unti
November 22, 2013 Read time: 2 mins
The Serbian Government is considering a loan from China’s 1290 Export-Import Bank, which would pay for the construction of the E-763 highway. The bank looks set to give its approval for the €223 million loan, which would pay for 90% of the construction work for the E-763, or Obrenovac-Ljig, highway. The loan would be approved over a 20 year repayment period and a five year grace period at the fixed rate of 2.5%/year.

Meanwhile tendering will open for completion works on Serbia’s Pirot-Dimitrovgrad highway until 9th January 2014. The project was originally to have been carried out by the Austrian company 2859 Alpine. However Alpine hit financial problems and work stopped, so the tender is for the remaining 14.3km of the highway still needing to be completed. The work will be funded by the 1166 European Bank for Reconstruction and Development (EBRD).

At the same time, there is now legal wrangling between the Serbian Government and the liquidation manager for Alpine, Jaksch Schoeller & Riehl. The Serbian company 3235 Koridori Srbije is seeking a repayment of €78 million in damages at the Vienna Trade Court. However Alpine is seeking payments from Serbia. A second review of the case will be carried out shortly for the respective financial demands.

Related Content

  • Border crossing boost for Chile and Argentina
    February 24, 2012
    The authorities in Chile and Argentina are discussing upgrades that can be made to several border crossings between the two countries.
  • Azerbaijan to rebuild roads
    March 16, 2012
    The European Bank for Reconstruction and Development (EBRD) is providing Azerbaijan with some US$750 million for road repairs.
  • Go-ahead for controversial highway
    May 30, 2012
    APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway. The work had been delayed as the European Commission (EC) was concerned over environmental issues facing sections of the route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms. The EC says that the sections in zones belonging to the Natura 2000 network can be built once terms are agreed with the Slovak government o
  • New bridge project for Sri Lanka
    September 30, 2013
    A bridge costing some US$321 million will be built in Sri Lanka to span the Kelani River. This new link will reduce congestion at Baseline Road and in the area of Peliyagoda. The bridge is expected to take three years to construct and will measure 415m long. The project is being funded by the Japan International Cooperation Agency (JICA), which is also funding the design detail and feasibility studies. Meanwhile the Asian Development Bank (ADB) has approved credit $75 million for the construction of roads l