Skip to main content

Slovakia bypass cost reduction

Revisions to a bypass project in Slovakia will help reduce the construction costs. The Prešov bypass is now being built with just two lanes, which will cut the construction costs by some€200 million. The project was initially expected to cost as much as €900 million and was criticised for its expense. Further plans for a tunnel at the northern end of the bypass are being discussed at present. Meanwhile revisions to the traffic system in Prešov are expected to bring further savings to the construction projec
February 23, 2017 Read time: 1 min
Revisions to a bypass project in Slovakia will help reduce the construction costs. The Prešov bypass is now being built with just two lanes, which will cut the construction costs by some€200 million. The project was initially expected to cost as much as €900 million and was criticised for its expense. Further plans for a tunnel at the northern end of the bypass are being discussed at present. Meanwhile revisions to the traffic system in Prešov are expected to bring further savings to the construction project.

Related Content

  • Stonehenge Bypass approved in the UK
    November 13, 2020
    The UK Government has approved the construction of the Stonehenge Bypass.
  • Slovakia’s sluggish highway works in 2023
    February 24, 2023
    Slovakia’s highway works will be sluggish in 2023.
  • Aberdeen to get bypass
    July 5, 2012
    The Scottish city of Aberdeen is to benefit from a new 45km bypass. The project is expected to cost €442.5 million and will provide a route around the city and tackle heavy traffic congestion on existing roads. Vehicles currently either have to use a series of small country roads or enter the congested city centre and these routes are unable to carry the volumes of traffic being handled at present. The new bypass will reduce congestion and improve safety but is likely to be completed well after 2012 as was
  • Cost of D1 section Hubova-Ivachnova rises 40%
    August 3, 2023
    In Slovakia, the 15km Ružomberok bypass, including the 3.6km Čebrať Tunnel, is now €93 million more expensive than nine years ago.