Skip to main content

Ramboll appointed independent engineer on Champlain Bridge Project

Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
September 8, 2015 Read time: 2 mins
Proposed Champlain Bridge (artist impression)
6801 Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada.

Ramboll, based in Denmark, will work with the Canadian consultant 5346 Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America.

Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion.

“The new contract is in line with Ramboll’s strategy for North America where we are pursuing several other larger bridge and tunnel projects,” said Lars Thorbek, head of Ramboll’s department for international bridges.

World Highways reported in April that the Canadian government had awarded the multi-billion dollar contract for the Champlain Bridge, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal.

The consortium, called Signature on the Saint-Lawrence Group, includes Spanish firms 4761 Dragados Canada and ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project includes a new île des Soeurs Bridge along with reconstruction and widening of the federal portion of Autoroute 15. But the crown-jewel of the project is the New Champlain Bridge, a 3.4 km crossing of the main channel of the St. Lawrence River, which includes a cable stay section over the St. Lawrence Seaway.

Construction is set to begin in the summer of 2015. The New Champlain Bridge will be in service in 2018 and the rest of the corridor will be completed in 2019.

This past summer, Canada-based Canam-Bridge was chosen to fabricate the superstructure for the new bridge. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, said at the time he expects at least 45,000tonnes of steel will be required for the 3.4km bridge.

For more information on companies in this article

Related Content

  • Palfinger sees revenue rise more than 14% in first half 2015
    August 5, 2015
    The Palfinger Group recorded revenue up by 14.1% to €606.2 million in the first six months of 2015, a new half-year record. Palfinger, a maker of loader cranes, marine cranes, wind cranes and container handling systems, noted that earnings grew more strongly than revenue. Earnings before interest and taxes rose by 29.6% to €53.7 million. The consolidated net result for the first half of 2015 was €34.6 million, 40.6% higher than the previous year's level. "We have been increasingly successful on internatio
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • Bidding strong for New York bridge link
    February 10, 2012
    Bidding is strong for the 30 year concession deal covering the Goethals Bridge linking New York and New Jersey. The contract will include financing, construction and management of the bridge and changes to the road alignment in a deal worth US$1.3 billion.
  • UK’s Mersey Gateway Project team invites final tenders
    February 26, 2013
    The team behind what is set to be one of the UK’s largest infrastructure initiatives in the next few years has invited final tenders from the three shortlisted bidders competing to deliver it. The Mersey Gateway Project bidders have been asked to submit their tenders on behalf of Halton Borough Council by 10 April 2013, and an announcement about the identity of the preferred bidder is due in June 2013. This will allow the team behind the North West England-based project to sign a contract and begin construc