Skip to main content

Ramboll appointed independent engineer on Champlain Bridge Project

Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
September 8, 2015 Read time: 2 mins
Proposed Champlain Bridge (artist impression)
6801 Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada.

Ramboll, based in Denmark, will work with the Canadian consultant 5346 Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America.

Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion.

“The new contract is in line with Ramboll’s strategy for North America where we are pursuing several other larger bridge and tunnel projects,” said Lars Thorbek, head of Ramboll’s department for international bridges.

World Highways reported in April that the Canadian government had awarded the multi-billion dollar contract for the Champlain Bridge, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal.

The consortium, called Signature on the Saint-Lawrence Group, includes Spanish firms 4761 Dragados Canada and ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project includes a new île des Soeurs Bridge along with reconstruction and widening of the federal portion of Autoroute 15. But the crown-jewel of the project is the New Champlain Bridge, a 3.4 km crossing of the main channel of the St. Lawrence River, which includes a cable stay section over the St. Lawrence Seaway.

Construction is set to begin in the summer of 2015. The New Champlain Bridge will be in service in 2018 and the rest of the corridor will be completed in 2019.

This past summer, Canada-based Canam-Bridge was chosen to fabricate the superstructure for the new bridge. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, said at the time he expects at least 45,000tonnes of steel will be required for the 3.4km bridge.

For more information on companies in this article

Related Content

  • PPP earmarked to fund Melbourne’s East West Link road project
    September 24, 2013
    The Victoria state government in Australia is planning to build Melbourne’s East West Link road costing US$5.64 billion (AUD 6 billion) to $7.53 billion (AUD 8 billion) on public-private partnership (PPP) basis and will award construction deals by the end of 2013. There are four consortia shortlisted for the18km tolled motorway project: Momentum Infrastructure, consisting of Leighton, John Holland, Iridium and Dragados; Sicuro, made up of Egis, Hyundai, Impregilo, Salini, Aquasia and InfraLinx Capital. T
  • China looks to the future with major highway plans
    February 15, 2012
    China is still moving ahead with plans that will give it the world's biggest highway system. Patrick Smith reports. As China's economy grows even more, keeping the country on the move has become a priority for the government. While the country has made great strides over the past decade in improving its infrastructure, the number of vehicles has also increased rapidly, and in some instances restrictions have been placed on them.
  • New Montenegro bridge – close to completion
    August 23, 2018
    Construction work on the Moracica bridge project in Montenegro is now close to completion. Measuring 960m long, the bridge spans the Moraca River Canyon and is the most complex portion of the 41km first section to be built for the new highway connecting Bar with Boljare. Work on the bridge is expected to be complete by April 2019 and the structure is being built using some 30,000m3 of concrete and 5,200tonnes of reinforcing steel. The tallest of the bridge’s five piers will measure 158.5m in height, with
  • Ontario’s Highway 413 revisited
    June 27, 2025
    Final property acquisitions are taking place for construction of Highway 413 in the Canadian province of Ontario to start later this year.