Skip to main content

Ramboll appointed independent engineer on Champlain Bridge Project

Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
September 8, 2015 Read time: 2 mins
Proposed Champlain Bridge (artist impression)
6801 Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada.

Ramboll, based in Denmark, will work with the Canadian consultant 5346 Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America.

Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion.

“The new contract is in line with Ramboll’s strategy for North America where we are pursuing several other larger bridge and tunnel projects,” said Lars Thorbek, head of Ramboll’s department for international bridges.

World Highways reported in April that the Canadian government had awarded the multi-billion dollar contract for the Champlain Bridge, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal.

The consortium, called Signature on the Saint-Lawrence Group, includes Spanish firms 4761 Dragados Canada and ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project includes a new île des Soeurs Bridge along with reconstruction and widening of the federal portion of Autoroute 15. But the crown-jewel of the project is the New Champlain Bridge, a 3.4 km crossing of the main channel of the St. Lawrence River, which includes a cable stay section over the St. Lawrence Seaway.

Construction is set to begin in the summer of 2015. The New Champlain Bridge will be in service in 2018 and the rest of the corridor will be completed in 2019.

This past summer, Canada-based Canam-Bridge was chosen to fabricate the superstructure for the new bridge. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, said at the time he expects at least 45,000tonnes of steel will be required for the 3.4km bridge.

For more information on companies in this article

Related Content

  • Australia highway projects being planned
    November 24, 2015
    Key highway projects are progressing in Australia. In the state of Victoria, the authorities are planning a road widening project for the Monash Freeway that will cost an estimated US$289.54 million (A$400 million). The project calls for the route to be widened to five lanes in either direction for the stretch between the EastLink and the South Gippsland Highway.
  • T.Y Lin International to start project management of fourth canal bridge
    June 2, 2016
    The president of Panama, Juan Carlos Varela, has given the green light to T.Y Lin International to start project managing construction of a fourth bridge over the Panama Canal. The US-based infrastructure engineering company won an international tender for the work likely to cost around US$17 million, according to local media. Pre-qualification has started for companies interested in participating on the billion-dollar project. The new bridge is one of three infrastructure projects within a five-ye
  • Pattullo Bridge deck near completion
    July 29, 2025
    For several weeks, crews have been installing concrete deck panels, steel girders and stay cables outward from the towers of the bridge that spans the Fraser River near Vancouver, Canada.
  • Five consortia line up for Denmark’s new Storstrøm Bridge project
    June 18, 2015
    The Danish government has shortlisted five consortia for construction of a new Storstrøm Bridge to replace an aging structure. The cost of the bridge connecting the Danish islands of Zealand and Falstser amounts to nearly €563 million (US$625.7 million) and the bridge will be financed by the government's Infrastructure Fund. Companies that qualified for the project are a joint venture consisting of Vinci Construction Grand ProjectsSAS, Hochtief Infrastructure GmbH and MT Højgaard; the consortium of St