Skip to main content

Projects planned for Nepalese highway network

A series of major trade routes are being upgraded in Nepal, which are intended to help boost bilateral trade with neighbouring India and China. This will see four key trade routes being upgraded to six lanes. These are the; Butwal-Belhiya, Rani-Ithari, Surybinayak-Dhulikhel and Birgunj-Pathalaiya highway sections. Work is already underway on the Butwal-Belihiya and Rani-Ithari highway sections while work is also being planned for the Suryabinayak-Dhulikhel and Birgunj-Pathalaiya highways. Of the 24km stretc
January 9, 2014 Read time: 2 mins
A series of major trade routes are being upgraded in Nepal, which are intended to help boost bilateral trade with neighbouring India and China. This will see four key trade routes being upgraded to six lanes. These are the; Butwal-Belhiya, Rani-Ithari, Surybinayak-Dhulikhel and Birgunj-Pathalaiya highway sections. Work is already underway on the Butwal-Belihiya and Rani-Ithari highway sections while work is also being planned for the Suryabinayak-Dhulikhel and Birgunj-Pathalaiya highways. Of the 24km stretch of the Butwal- Belhiya road some 5km is being paved with an asphalt concrete pavement featuring a wearing course of 40mm thickness. A similar design is being used on a 3km section of the Rani-Ithari route. For the improvement works to an additional 6km stretch of the Butwal- Belhiya highway and a 5km section of the Rani-Ithari route, the 5283 Nepalese Government is planning to award the work to a contractor shortly. The Nepalese Government has allocated some US$9.61million for the fiscal year 2013/2014 for work on the four routes.

A 15.4km stretch of the Suryabinayak- Dhulikhel route will benefit from funding provided in the shape of a soft loan from the Japanese Government. According to an official at the Nepalese Government; Japan International Co-Operation Agency (6706 JICA) has expressed interest in providing the loan at 0.1% interest keeping 30 years period for payment. The Nepalese Government is planning to implement work to widen a 28km stretch of the Birgunj-Pathlayia route under the BOOT structure.

These routes will be improved including service lanes and equipped with bus stops, traffic lights, necessary measures for safety, parking, signs and bridges.

The government is expecting to address the problems faced by Nepalese cross border trade after these routes are completed and the work will help improve the country’s economy overall. The Nepalese Government also aims to improve the country’s rating in the 2332 World Bank’s international business index.

For more information on companies in this article

Related Content

  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Nepalese bridge issues
    May 4, 2012
    In Nepal a 159m long suspension bridge spanning the Trishuli River has collapsed, killing two and injuring 17 while five people are posted as missing. Meanwhile in neighbouring India, an old wooden bridge spanning the Rangit River has collapsed killing 32, injuring 70 and leaving 35 missing. A significant portion of those killed, injured or missing are Nepali speaking tea workers.
  • Road upgrade work planned for Paraguay
    May 26, 2022
    Road upgrade work is planned for a key route in Paraguay.
  • Bidding for Uganda road connecting Kampala and Jinja
    May 22, 2018
    In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French De