Skip to main content

Projects planned for Nepalese highway network

A series of major trade routes are being upgraded in Nepal, which are intended to help boost bilateral trade with neighbouring India and China. This will see four key trade routes being upgraded to six lanes. These are the; Butwal-Belhiya, Rani-Ithari, Surybinayak-Dhulikhel and Birgunj-Pathalaiya highway sections. Work is already underway on the Butwal-Belihiya and Rani-Ithari highway sections while work is also being planned for the Suryabinayak-Dhulikhel and Birgunj-Pathalaiya highways. Of the 24km stretc
January 9, 2014 Read time: 2 mins
A series of major trade routes are being upgraded in Nepal, which are intended to help boost bilateral trade with neighbouring India and China. This will see four key trade routes being upgraded to six lanes. These are the; Butwal-Belhiya, Rani-Ithari, Surybinayak-Dhulikhel and Birgunj-Pathalaiya highway sections. Work is already underway on the Butwal-Belihiya and Rani-Ithari highway sections while work is also being planned for the Suryabinayak-Dhulikhel and Birgunj-Pathalaiya highways. Of the 24km stretch of the Butwal- Belhiya road some 5km is being paved with an asphalt concrete pavement featuring a wearing course of 40mm thickness. A similar design is being used on a 3km section of the Rani-Ithari route. For the improvement works to an additional 6km stretch of the Butwal- Belhiya highway and a 5km section of the Rani-Ithari route, the 5283 Nepalese Government is planning to award the work to a contractor shortly. The Nepalese Government has allocated some US$9.61million for the fiscal year 2013/2014 for work on the four routes.

A 15.4km stretch of the Suryabinayak- Dhulikhel route will benefit from funding provided in the shape of a soft loan from the Japanese Government. According to an official at the Nepalese Government; Japan International Co-Operation Agency (6706 JICA) has expressed interest in providing the loan at 0.1% interest keeping 30 years period for payment. The Nepalese Government is planning to implement work to widen a 28km stretch of the Birgunj-Pathlayia route under the BOOT structure.

These routes will be improved including service lanes and equipped with bus stops, traffic lights, necessary measures for safety, parking, signs and bridges.

The government is expecting to address the problems faced by Nepalese cross border trade after these routes are completed and the work will help improve the country’s economy overall. The Nepalese Government also aims to improve the country’s rating in the 2332 World Bank’s international business index.

For more information on companies in this article

Related Content

  • Improved road links between Kenya and Tanzania
    July 22, 2013
    Work on the Taveta-Voi road link connecting Kenya and Tanzania is now being planned. The African Development Bank is providing a loan worth US$113 million. The work includes widening and improving a 42km bypass at Arusha and upgrades to a 115km section of road between Holili and Arusha. This package of works is due for completion by 2018. The Kenyan Government is itself funding upgrades to a 24km section of road running from Voi-Mwatate. Many of the existing links between Kenya and Tanzania are in poor cond
  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • Nepal tunnel project funding from Japan
    December 1, 2016
    Funding from the Japan International Cooperation Agency (JICA) will help with the construction of a new tunnel as well as road links in Nepal. The US$168.56 million funding package comes in the shape of a loan to Nepal’s Government. This will be used to pay for the construction of a 2.5km tunnel that will link Nagdhunga with Naubise. The loan will also pay for the 7km of road on either side of the tunnel. The project is due for completion in 2022 and will fall under the jurisdiction of the Department of Roa
  • Nigeria has built a major road link from concrete
    September 14, 2016
    A new concrete road is now open to traffic in Nigeria’s Kogi State. This is of note as the new 24km road is the now the country’s longest to be made from concrete. The new road was built in a joint venture partnership between Nigerian firm Dangote Construction and Brazilian company Andrade Gutierrez. The new road connects Kabba with Obajana. Part of the Dangote Group, Dangote Construction was well placed to carry out the work as it operates its Obajana Cement production facility, at Obajana. This new road