Skip to main content

Philippines bridge project receiving Chinese assistance?

Plans are moving forward with regard to the Iloilo-Guimaras-Negros Bridge in the Philippines. Building the 13.2km bridge is expected to cost up to US$457 million and take three years to be completed once the construction gets underway. The bridge will be built in the Visayas Region of the Philippines and would link a number of islands, replacing the ferry services in use at present. Chinese expertise may be employed to help design and construct the link while South Korean sources could deliver a portion of
November 16, 2016 Read time: 2 mins
Plans are moving forward with regard to the Iloilo-Guimaras-Negros Bridge in the Philippines. Building the 13.2km bridge is expected to cost up to US$457 million and take three years to be completed once the construction gets underway. The bridge will be built in the Visayas Region of the Philippines and would link a number of islands, replacing the ferry services in use at present. Chinese expertise may be employed to help design and construct the link while South Korean sources could deliver a portion of the funding required. A feasibility study is being carried out at present. Construction work could commence as early as 2017 although the tender process has yet to be announced. The project will be highly challenging and the bridge will be the longest in the Philippines once complete. Chinese experience in building the Hong Kong-Macau-mainland China bridge may well be of major benefit for the Philippines project.

Related Content

  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight
  • Mozambique bridge due to open
    May 11, 2018
    Mozambique’s Maputo-Catembe Bridge is due to open shortly and will become Africa’s longest suspension bridge. The 3km bridge will form part of the road connection between Maputo, Mozambique’s capital, and Catembe. The bridge is costing over US$700 million, with much of the necessary funding being provided by the Export Import Bank of China. The new bridge will improve transport and reduce journey times for drivers, who currently have to rely on ferries travelling between Maputo and Catembe.