Skip to main content

OHL and Astaldi win California highway contract

Contractors OHL and Astaldi has won a major portion of a large highway project in California. The work is for the upgrade to I-405 in Los Angeles and is valued at US$ 1.2 billion. The two firms will work in a joint venture on the project. OHL has a 60% stake in the project while Astaldi holds the remaining 40% share. The deal represents a positive move for Astaldi, which is keen to develop its presence in the western US. The six year contract requires the design and construction of the improvement works
November 15, 2016 Read time: 2 mins
Contractors 980 OHL and 1324 Astaldi has won a major portion of a large highway project in California. The work is for the upgrade to I-405 in Los Angeles and is valued at US$ 1.2 billion. The two firms will work in a joint venture on the project. OHL has a 60% stake in the project while Astaldi holds the remaining 40% share. The deal represents a positive move for Astaldi, which is keen to develop its presence in the western US.

The six year contract requires the design and construction of the improvement works for 22km of the interstate. The complexity of the works, which also includes the construction of 35 bridges, is accentuated by the need to maintain the infrastructure in operation for the entire duration of the activities.

The works have been commissioned by the OCTA Orange County Transportation Authority. Financing is being delivered through a combination of local, state, and federal funds.

For more information on companies in this article

Related Content

  • Stantec wins California roads study
    February 28, 2012
    Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the US State of California.
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
  • $78 million Granite contract in CA
    February 17, 2025
    Granite construction is working on a $78 million contract in CA.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill