Skip to main content

New road and bridge investment for Guatemala

The Central American Bank for Economic Integration (CABEI) is providing a US$400 million loan to Guatemala for rural road construction. This follows on from a $200 million loan being provided to Guatemala by the World Bank and a $237 million loan from the IADB. The Guatemalan Government is also working on upgrading CA9 Norte highway to make it reach Mayuelas completing an 89km extension at a cost of $240 million. The authorities also have plans to replace 60-70 bridges with new structures.
November 25, 2013 Read time: 1 min
The 863 Central American Bank for Economic Integration (CABEI) is providing a US$400 million loan to Guatemala for rural road construction. This follows on from a $200 million loan being provided to Guatemala by the 2332 World Bank and a $237 million loan from the IADB. The Guatemalan Government is also working on upgrading CA9 Norte highway to make it reach Mayuelas completing an 89km extension at a cost of $240 million. The authorities also have plans to replace 60-70 bridges with new structures.

For more information on companies in this article

Related Content

  • Argentina road projects financing established
    December 7, 2016
    Argentina is receiving a loans from the Inter-American Development Bank (IADB) worth US$300 million for road improvements. The loan will be used to widen and improve roads across the country and is for 25 years with a grace period of 4.5 years. The Argentina Government will provide a further $200 million for road development projects. Planned projects include a new 120km dual carriageway as well as work to a 35.4km section of National Route 19 in Cordoba Province. Meanwhile around half of Salta Province
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Russia seeks outside investment in road building
    November 6, 2012
    The Russian road building industry is on the verge of big changes as it bids to improve quality and speed of construction says Eugene Gerden The Russian road building industry is on the verge of big changes as the national government considers creating conditions to attract foreign companies to build roads in the country. According to a recent order of President Vladimir Putin, due to poor quality and high cost of road construction, there is a need for the development of a mechanism to attract foreign compa