Skip to main content

New PPP road project for Aruba

The tender process is being opened for a new PPP road project for the island of Aruba. The Watty Vos Boulevard tender will be under the design, build, finance and maintain model, set out under a 22 year package by Aruba’s Government. The tender process is open to local and international contractors and consultants. The total cost of the project is estimated at around US$120 million. The work involves rebuilding some 7km of road along a 17km stretch as well as upgrading 12 intersections and building two over
January 27, 2014 Read time: 1 min
The tender process is being opened for a new PPP road project for the island of Aruba. The Watty Vos Boulevard tender will be under the design, build, finance and maintain model, set out under a 22 year package by Aruba’s Government. The tender process is open to local and international contractors and consultants. The total cost of the project is estimated at around US$120 million. The work involves rebuilding some 7km of road along a 17km stretch as well as upgrading 12 intersections and building two overpasses.

Related Content

  • A new highway contract for Costa Rica
    March 5, 2020
    An addition to a new highway contract is planned for Costa Rica.
  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • New Kentucky-Ohio bridge link planned
    August 17, 2023
    A new Kentucky-Ohio bridge link is being planned.
  • Tender process in hand for Polish ring road project
    August 27, 2014
    The tender process is opening for new road connections in Poland. Ring roads are planned around the Polish city of Radom as well as the town of Gora Kalwarii while there are plans for a new dual carriageway section of the S8 between Radziejowice and Paszko. In all the work is expected to cost€716.5 million. The tender process has been called by the Polish road administration, GDDKiA. The Radom bypass will be some 25km long while a21km stretch of the S8 will be upgraded to dual carriageway status, with this