Skip to main content

New bridge to span Neva River in St Petersburg

A new bridge is planned for St Petersburg. The link will span the Neva River and will form part of the Western High-Speed Radius route. The project is expected to cost US$2.26 billion. The authorities in St Petersburg are currently looking for potential investors in the project as well as an engineering firm able to carry out the detailed planning work necessary.
September 30, 2015 Read time: 1 min
A new bridge is planned for St Petersburg. The link will span the Neva River and will form part of the Western High-Speed Radius route. The project is expected to cost US$2.26 billion. The authorities in St Petersburg are currently looking for potential investors in the project as well as an engineering firm able to carry out the detailed planning work necessary.

Related Content

  • Massachusetts Turnpike upgrade delayed
    December 3, 2020
    Upgrade work on the Massachusetts Turnpike in Boston will now be delayed.
  • Bridge under discussion for UK's Thames River
    March 22, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Avtodor tender for new section of Moscow-St. Petersburg road
    August 6, 2013
    Russian state company Avtodor is to announce a tender for a new €3.42 billion (RUB 149.1 billion) section of Moscow-St. Petersburg toll highway. The new section will be between the road's 334th and 543rd kilometres, which passes through the Tver (Central) and the Novgorod (North-West) regions. Avtodor will hold a Dutch auction. Private investments will account for about €229.07 million (RUB 10bn) of the project's financing (own and borrowed funds in equal measures), and the remaining funds will come from th
  • Construction consortium conquers in contract for Moscow-St Petersburg highway section
    May 13, 2014
    A consortium has won a key construction and concession contract in Russia for a stretch of the Moscow-St Petersburg highway. The construction consortium comprises contractor Vinci and Russian Bank VTB. The deal involves around US$1.7 billion of public financing for the construction phase and some $983 million for operation for the period of the contract. The concession package involves construction of the highway section, as well as operation for a 24 year period. The construction work will be carried out b