Skip to main content

New bridge project to boost Myanmar-Thailand cross-border connectivity

The tender process is being planned for the Myanmar-Korea Friendship Bridge, which will connect Myanmar’s commercial centre Yangon to Dala Township. Over $137 million in loans have been pledged by the Korean Economic Development Cooperation Fund to develop the 1.87km long suspension bridge. The tender process will be international and the work is due for completion by 2020. In all the project is expected to cost in the region of $168 million.
June 4, 2015 Read time: 2 mins
The tender process is being planned for the Myanmar-Korea Friendship Bridge, which will connect Myanmar’s commercial centre Yangon to Dala Township. Over $137 million in loans have been pledged by the Korean Economic Development Cooperation Fund to develop the 1.87km long suspension bridge. The tender process will be international and the work is due for completion by 2020. In all the project is expected to cost in the region of $168 million.

Meanwhile plans are in hand for the bridge connecting Thailand with Myanmar. The Thai cabinet approved a $115.7 million budget to build a second Thai-Myanmar bridge across the Moei River. The project also includes building 21.4km long, four-lane road to support the Mae Sot special economic zone (SEZ). The project will help develop investment and trade in border areas. Construction work is expected to begin in September 2015. In addition, agreements have also been struck between Myanmar and Cambodia with regard to their cross-border agreement, also intended to boost trade. A total of four border checkpoints are covered under the agreement including Singkhon checkpoint, Baan Phu Namron checkpoint, Mae Sot-Myawaddy checkpoint and Mae Sai-Tachilek checkpoint.

Related Content

  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • XCMG expanding range and developing products
    January 5, 2016
    The firm is steadily moving up the size scale with its machines, introducing heavy equipment aimed at the extraction industries, in addition to new and more versatile machines for construction users and road machinery. The firm is working hard to develop new large excavators and trucks to meet demand from the extraction industries. The large excavators and rigid trucks are now a key part of the product range as XCMG wants to increase its profile in the extraction sector. The company has also struck an a
  • Bridge link underway in Texas
    March 22, 2012
    In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls. The Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges.
  • China Harbor Engineering picks up Brunei’s Muara Besar project
    May 11, 2015
    Brunei has awarded Chinese infrastructure construction company China Harbor Engineering Company (CHEC) the US$204 million Pulau Muara Besar Bridge, Road and Utilities project through an open tender. CHEC reportedly signed the deal with the Brunei Economic Development Board on May 6, according to Chinese media. Pulau Muara Besar is a 955ha island in Brunei Bay, immediately across from Brunei’s largest port town, Muara, on the mainland. The island is undergoing major infrastructure development including