Skip to main content

Nepal road transport plan finds funding

Nepal’s Kathmandu-Tarai highway now looks likely to be built under an engineering, procurement and construction (EPC) contract. This is a revision from the build-own-operate-transfer (BOOT) model previously suggested. Nepal's Ministry of Physical Infrastructure and Transport has announced the change for the project, which had an estimated cost of US$1.04 billion when put forward in 2015. The detailed project report (DPR) for the highway is likely to be set out by consortium, from India. The Nepalese Governm
February 27, 2017 Read time: 1 min
Nepal’s Kathmandu-Tarai highway now looks likely to be built under an engineering, procurement and construction (EPC) contract. This is a revision from the build-own-operate-transfer (BOOT) model previously suggested. Nepal's Ministry of Physical Infrastructure and Transport has announced the change for the project, which had an estimated cost of US$1.04 billion when put forward in 2015. The detailed project report (DPR) for the highway is likely to be set out by consortium, from India. The Nepalese Government has been evaluating options over the project. The DPR will be used as a reference document for the EPC tender and the winning contractor will then carry out a detailed engineering report to determine the cost of the work. Meanwhile a loan worth US$536.8 million is being provided by India for work to Nepal’s road and bridge links.

Related Content

  • Nepal road upgrades being planned
    November 28, 2016
    A series of infrastructure upgrades are planned for Nepal that will help improve its economic development. A key infrastructure requirement for Nepal is the development of its road network. In a move to tackle the issue, Nepal’s Ministry of Physical Infrastructure and Transport has initiated the strategy for the development of roads in all 75 districts by 2022. About US$7.5 billion has been estimated as being required for the completion of this project. Funding will require financing from internal sources
  • Nepalese Government pushes ahead with transport infrastructure programme
    July 17, 2014
    The Nepalese Government has announced a major programme of transport infrastructure works for the 2014-2015 period. Road, highway and airport projects have all been prioritised. The detailed project report for the Kathmandu-Tarai Fast Track Road is to be completed within six months. The proposal aims to attract investors by guaranteeing a minimum number of vehicles using the tolled link. The project has been delayed due funding issues. This period will also see work being carried out the Mid-Hills Highway,
  • Two bridges in Nepal to help power generation increase
    October 11, 2012
    Construction of two vital bridges in Nepal will help increase power generation and offer a return on investment Two bridges are required in Nepal to enable the country to address its current capacity shortfall in electric power generation. Once constructed, they will be the largest single-span truss bridges in Nepal. Construction of the Arun River Bridge at Leguwaghat, Dhankuta, and Sabha Khola Bridge, Sankhuwasabha District, is also required to maximise the rate of return on special programmes under the R
  • Louis Berger wins key India bridge deal
    January 10, 2018
    Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish