Skip to main content

Nepal plans road transport development

The Nepalese Government is planning a major programme of road development for the next three years. The aim of the programme is to build new roads that will join up to 500 Village Development Committee (VDC) locations that are not linked at present to the road network. According to the guidelines of the Ministry of Local Development, the Department of Local Infrastructure Development (DoLIDAR) has set a target to connect every VDC in Nepal with motorable roads. This is no small challenge however as Nepal is
May 17, 2016 Read time: 3 mins
Constructing road links in Nepal presents major challenges
The Nepalese Government is planning a major programme of road development for the next three years. The aim of the programme is to build new roads that will join up to 500 Village Development Committee (VDC) locations that are not linked at present to the road network. According to the guidelines of the Ministry of Local Development, the Department of Local Infrastructure Development (DoLIDAR) has set a target to connect every VDC in Nepal with motorable roads. This is no small challenge however as Nepal is home to the Himalayas, the world’s highest mountain range.

Director general of DoLIDAR, Ram Krishna Sapkota, explained that the road extension programme is being geared up by the ministry, so the preparation of the action plan is now underway. In the last year’s survey there were no road connection to 584 VDCs in Nepal. Of these 584 however, 100 VDCs have been connected with by motorable roads in the 2015/2016 fiscal year. For the remaining 480 VDCs, an action plan is being prepared that will deliver the necessary connectivity within three years. Around US$ 1.5 billion is required to deliver this road link-up programme according to DoLIDAR.

Preparatory works have been carried out by DoLIDAR to provide the action plan. According to DoLIDAR statistics some 7,268km of roads were required initially to connect all 584 VDCs. But with 100 of the VDCs having been connected, only 6,038km will be required to link the remaining 480 VDCs. Among the areas still to be connected, Taplejung district lacks motorable roads in 23 VDCs, Panchthar district lacks road in 20 VDCs, Illam district lacks in 5 VDCs, Morang district has one VDC without roads as does Dhankuta district. Meanwhile Sankhuwasabha district has 10 VDCs without road connections, Bhojpur district has 12 VDCs, Solukhumbu district has 19 VDCs and Okhaldhunga district has 11 VDCs. In addition, Khotang district lacks road in 28 VDCs, Udyapur district 14 VDCs, Sindhuli district 24 VDCs and in Ramechhap district 2 VDCs were not linked up with the motorable roads.

The motorable road connectivity has not reached one VDC in Lalitpur, two in Dolakha district, two also in Sindhupalchowk district, seven in Kavre district, six in Nuwakot district and six in Rasuwa district. Meanwhile there are five VDCs in Dhading district without road connections, 10 in Makwanpur district, one in Chitwan district, 11 in Gorkha district and seven in Lamjung district, while there are three VDCs in Tanuhun district not linked by road. Humla is the only district in Nepal where motorable road have not so far not reached, while Baitadi district is also remote as it lacks road connections to 42 VDCs.

Related Content

  • Nepal’s road safety awareness programme is now commencing
    April 12, 2013
    A half day seminar has been run in Nepal with aim of reducing road fatalities. The seminar focussed on the Role of Roads Board Nepal in creating road safety awareness. This event was set up by the Road Board Nepal, a government agency established under the Road Board Act 2002. The agency has the aim of providing a sustainable fund for planned maintenance of the roads in association with local NGOs; Nepal Forum for Rural Transport and Development (NFRTD) and Nepal Road Safety Society. Engineer Ramesh Bastola
  • Nepal's bridge issues
    February 23, 2012
    Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
  • “Record” cash for filling English potholes
    March 25, 2025
    The transport secretary also unveiled funding for 2025-26 for National Highways, the English road agency, to deliver critical road schemes and maintain motorways and critical major A-roads.
  • Rare Indian red granite extracted from village quarries
    June 25, 2013
    Rare Indian red granite is being extracted from four granite quarries across 24hectares of land in the south Indian villages of Purthagere and Kadur According to legend, Ilkal granite (also known as Cat’s Eye granite) was first discovered 2,000 years ago, but remained a little known rarity for two millennia. This all changed in 1983 when rich deposits were discovered in a small corner of south-west India, allowing Ilkal granite to be exploited for its beauty and decorative worth.