Skip to main content

Maintenance, repairs and replacements needed for US Bridges

The US is in desperate need of rebuilding many of its road bridges. This comes from an analysis of official data carried out by the American Road and Transportation Builders Association (ARTBA). According to ARTBA’s analysis of the US Department of Transportation’s just released 2017 National Bridge Inventory database, 54,259 of the nation’s 612,677 bridges are rated structurally deficient. The work is needed as these transport links are vital, with Americans crossing these deficient bridges 174 million
February 1, 2018 Read time: 2 mins

The US is in desperate need of rebuilding many of its road bridges. This comes from an analysis of official data carried out by the American Road and Transportation Builders Association (ARTBA). According to ARTBA’s analysis of the US Department of Transportation’s just released 2017 National Bridge Inventory database, 54,259 of the nation’s 612,677 bridges are rated structurally deficient. The work is needed as these transport links are vital, with Americans crossing these deficient bridges 174 million times/day. The average age of a structurally deficient bridge is 67 years, compared to 40 years for non-deficient bridges. The report says that one in three (226,837) US bridges have identified repair needs and more worryingly still, one in three (17,726) Interstate highway bridges have identified repair needs.

The US Interstate Highway System carries 75% of the nation’s heavy truck traffic.  The report finds there is the equivalent of one “structurally deficient”-rated bridge, on average, for every 43km of the major highway network. The 1,800 structurally deficient Interstate bridges are crossed 60 million times daily.

The pace of improving the inventory of structurally deficient bridges slowed this past year.  At the current pace of repair or replacement, it would take 37 years to remedy all of them, according to Dr Alison Premo Black, chief economist for the American Road & Transportation Builders Association (ARTBA), who conducted the analysis.

Related Content

  • Cummins completes China collection
    November 21, 2018
    Cummins has showcased a full line of China Nonroad Stage IV emissions engines with the unveiling of the upgraded high performance 8.9-litre L series engine. The unit moves up to 298kW with a peak torque of 1800Nm – an 11% increase on its predecessor – and offers class-leading fuel economy and the ability to run at high altitudes while maintaining power capability. Cummins full line-up of engines for the new China Nonroad Stage IV emissions standard spans 2.8 to 15 litres displacement with a power capabili
  • Lower traffic emissions in London
    May 20, 2019
    London’s ultra-low emission zone (ULEZ) system is already proving successful. In the first month since the scheme was introduced, the number of non-compliant vehicles entering the charging zone has been reduced by 9,400/day, a drop of 26%. According to the latest research, 74% of vehicles entering the ULEZ have been in compliance with the emission requirements.
  • Virginia highway toll - first of many?
    February 24, 2012
    In the US state of Virginia, the Governor Robert McDonnell is suggesting a new toll on Interstate 95 to help pay for road repairs.
  • Germany’s B-85 gets the treatment from Bomag’s BM 2200/75 planer
    February 23, 2018
    By this spring, Bomag’s new BM 2200/75 cold planer will have removed all the old pavement from a 2.6km section of Germany’s federal highway B-85. Work on the section between Amberg and Pittersberg started at the end of 2016 after the Ministry of Transport classified the road as being in “urgent need” of upgrading as part of the Federal Transport Infrastructure Plan. Actual roadworks began in mid-June 2017 after essential forestry work had been carried out, such as the removal of tree roots on both sides