Skip to main content

Legal step for Czech tunnel project

The torturous legal case regarding the stalled Blanka Tunnel project in the Czech Republic has taken one step forward. An arbitration court in the country has ruled that the tunnel has to be completed within five months' time. The construction work was halted earlier due to a dispute between the contractor and the city authorities. The tunnel is required to help reduce traffic congestion in the Czech capital Prague with work having commenced in 2007. The project was originally supposed to be ready for traff
April 23, 2014 Read time: 2 mins
The Blanka Tunnel in the Czech capital Prague features innovative technology but work has been hit by legal issues
The torturous legal case regarding the stalled Blanka Tunnel project in the Czech Republic has taken one step forward. An arbitration court in the country has ruled that the tunnel has to be completed within five months' time. The construction work was halted earlier due to a dispute between the contractor and the city authorities. The tunnel is required to help reduce traffic congestion in the Czech capital Prague with work having commenced in 2007. The project was originally supposed to be ready for traffic by 2011 but costs spiralled and this was one of several factors along with allegations of performance targets not having been met that gave rise to the current complex court cases. This latest judgement calls for the city of Prague to pay some €145.64 million to the construction firm Metrostav. However the firm is seeking an additional €36.4 million from the city, which will be handled in court in June 2014.

Related Content

  • Chile’s Cau Cau bridge is to be rebuilt
    August 1, 2016
    The tender process for Chile’s Cau Cau Bridge rebuilding project is due to be opened in August 2016.
  • Eurasphalt & Eurobitume 2016 Congress calls for better communication
    August 5, 2016
    The bitumen industry needs to learn how to communicate with road owners, road users, and communities. This was one of the underlying themes to emerge from the Eurasphalt & Eurobitume 2016 Congress, held in the Czech capital Prague in June. Kristina Smith was there.
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong