Skip to main content

Key New Zealand highway upgrade, budget set

Work on New Zealand’s State Highway 3 will see upgrades to improve capacity and s well as safety. The country’s Ministry of Transport has unveiled a government plan to spend US$94.46 million (NZ$135 million) on the project. The upgrades for State Highway 3 form part of New Zealand’s Accelerated Regional Roading Programme. Meanwhile further planning work has been required to the Mount Messenger bypass before a preferred option for the project can be confirmed. The New Zealand Transport Agency (NZTA) is curre
April 20, 2017 Read time: 2 mins
Work on New Zealand’s State Highway 3 will see upgrades to improve capacity and s well as safety. The country’s Ministry of Transport has unveiled a government plan to spend US$94.46 million (NZ$135 million) on the project. The upgrades for State Highway 3 form part of New Zealand’s Accelerated Regional Roading Programme. Meanwhile further planning work has been required to the Mount Messenger bypass before a preferred option for the project can be confirmed. The 1009 New Zealand Transport Agency (NZTA) is currently developing an option for the bypass. This will be announced in August 2017.


An Alliance team to handle the Mount Messenger project has been established. This group includes the NZTA, as well as 2670 Tonkin & Taylor, Isthmus, Holmes Consulting, 1523 Opus International and 2679 Downer. The NZTA is also commencing the consent and design process for the two-bridge bypass at Awakino Tunnel, which was chosen as the preferred option. In addition, several upgrades will be made on the 58km stretch of highway that will include slope stability, road realignment and road widening.

For more information on companies in this article

Related Content

  • Key African highway concession signed
    April 19, 2022
    The concession package has been signed for a key African highway.
  • Tenders soon to replace Beaumont Bridge
    May 4, 2021
    The Waka Kotahi, NZ Transport Agency, said construction over the Clutha River is expected to take two years and cost around US$14.5 million.
  • Doosan excavators key to Germany B 2 highway upgrade
    April 2, 2014
    Thannhauser + Ulbricht Straßen- und Tiefbau (TU) is employing four new Doosan DA30 articulated dump trucks (ADTs) and a new Doosan DX490LC-3 crawler excavator for the earthmoving work during the upgrade of Germany’s B2 federal highway. The machines being used by TU, based in Fremdingen, southern Germany, belong to the rental fleet of Rühle Maschinenpark from Untermünkheim-Haagen.
  • India tollway deal plus work for roads, bridges and tunnels
    July 11, 2017
    A 21-year concession deal has been agreed for the widening project for a 114km stretch of road linking Gujarat and Rajasthan states in India. The route will be widened to six lanes, with three in either direction. The project financing is worth over US$226 million, with a group of lenders having agreed the terms for the project with the National Highways Authority of India (NHAI). The agreement has been achieved by Udaipur Tollways, disclosed IRB Infrastructure Developers, which owns the special purpose veh