Skip to main content

Key highway project in Colombia faces delay

Work on a key stretch of Colombia’s Ruta del Sol highway project is behind schedule, with the route now unlikely to open to traffic before 2017. The 21.6km section of the highway facing these delays will link Villeta and Guaduas in Cundinamarca. A key challenge is technical as the US engineering firm Gall Zeidler Consultants has warned Colombia’s infrastructure agency (ANI) that this section of the route is geologically unstable. The proposed route could be at risk from slippage and will need to be stabilis
December 2, 2013 Read time: 2 mins
Work on a key stretch of Colombia’s Ruta del Sol highway project is behind schedule, with the route now unlikely to open to traffic before 2017. The 21.6km section of the highway facing these delays will link Villeta and Guaduas in Cundinamarca. A key challenge is technical as the US engineering firm Gall Zeidler Consultants has warned Colombia’s infrastructure agency (ANI) that this section of the route is geologically unstable. The proposed route could be at risk from slippage and will need to be stabilised, while it will also require very short tunnel sections and viaducts as well as rerouting. The Colombian Society of Engineers (SCI) will have to prepare plans for the route while the tender process and construction work will also have to be prepared carefully to minimise problems. Around 170km of the Ruta del Sol will be accessible by the end of 2014, including the Bogota-Villeta dual carriageway and the Puerto Salgar-Guaduas road. The old road will be used until the first stretch is completed.

Meanwhile Spanish firm 980 OHL Concesiones has pre-qualified in the tender of eight contracts in Colombia. The deals will be worth $4.75 billion and OHL is interested in the construction and management of 1,146km worth of highways. These form part of a package for 10 projects known as Autopistas para la Prosperidad. OHL has expressed an interest in the Autopista al Mar 2 and Autopista al Rio Magdalena 1 highway projects, which have been valued at around $1.9 billion.

For more information on companies in this article

Related Content

  • Kenya port suspension bridge project makes progress
    January 15, 2019
    A new suspension bridge in Kenya’s key port city, Mombasa, will help unlock potential – Shem Oirere reports Plans for the construction of a US$200 million suspension bridge in Kenya heva moved a notch higher. The country's urban roads agency recently announced the shortlisting of three bidders for the design, finance, construct, operate, maintain and transfer public private partnership (PPP) contract model. Kenya Urban Roads Authority (KURA) is a state agency that manages, develops, rehabilitates and mai
  • £355 million Hull road project delayed
    December 23, 2024
    A £355 million road project for the UK city of Hull road has been delayed.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Paraguay highway project delayed
    November 9, 2018
    Work to improve a major highway connection in Paraguay has been delayed, but will be completed shortly. A consortium, Rutas del Este, is carrying out the work to improve the stretch of Ruta 2 from San Lorenzo to Ypacaraí. The consortium is headed by contractor Sacyr and has been carrying out the work for the PPP deal to upgrade the Ruta 2 and Ruta 7 highways between Ypacarai and Pastoreo.