Skip to main content

Key highway project in Colombia faces delay

Work on a key stretch of Colombia’s Ruta del Sol highway project is behind schedule, with the route now unlikely to open to traffic before 2017. The 21.6km section of the highway facing these delays will link Villeta and Guaduas in Cundinamarca. A key challenge is technical as the US engineering firm Gall Zeidler Consultants has warned Colombia’s infrastructure agency (ANI) that this section of the route is geologically unstable. The proposed route could be at risk from slippage and will need to be stabilis
December 2, 2013 Read time: 2 mins
Work on a key stretch of Colombia’s Ruta del Sol highway project is behind schedule, with the route now unlikely to open to traffic before 2017. The 21.6km section of the highway facing these delays will link Villeta and Guaduas in Cundinamarca. A key challenge is technical as the US engineering firm Gall Zeidler Consultants has warned Colombia’s infrastructure agency (ANI) that this section of the route is geologically unstable. The proposed route could be at risk from slippage and will need to be stabilised, while it will also require very short tunnel sections and viaducts as well as rerouting. The Colombian Society of Engineers (SCI) will have to prepare plans for the route while the tender process and construction work will also have to be prepared carefully to minimise problems. Around 170km of the Ruta del Sol will be accessible by the end of 2014, including the Bogota-Villeta dual carriageway and the Puerto Salgar-Guaduas road. The old road will be used until the first stretch is completed.

Meanwhile Spanish firm 980 OHL Concesiones has pre-qualified in the tender of eight contracts in Colombia. The deals will be worth $4.75 billion and OHL is interested in the construction and management of 1,146km worth of highways. These form part of a package for 10 projects known as Autopistas para la Prosperidad. OHL has expressed an interest in the Autopista al Mar 2 and Autopista al Rio Magdalena 1 highway projects, which have been valued at around $1.9 billion.

For more information on companies in this article

Related Content

  • Bancolombia boosts its investment in Colombia 4G road projects
    August 4, 2016
    Bancolombia has the largest involvement of all Colombia’s banks in the country’s 4G Road Programme after financial close of the Autopista Norte motorway project. The bank has around US$390 million invested in four out of five 4G road development projects that have secured the necessary funding so far, according to a report in Portafolio, an on-line economic magazine. The 145km Autopista Norte route connects the Caribbean port of Cartagena to the capital Bogota by way of the Ruta del Sol motorway, a 1,
  • ANI to auction 13 Colombian road projects in H1 2014
    September 24, 2013
    Colombia's national infrastructure agency ANI will auction 13 road projects with a combined value of more than US$7.87 billion (COP 15 trillion) in H1 2014, out of 40 planned. Nine of the scheduled auction projects have gone through the pre-qualification stage and will be definitely awarded in the first quarter of next year. In total, all 40 projects will involve investments of COP 47tn. The plan is to improve 8,000kms of roads in the country.
  • Colombian road projects recommencing
    May 18, 2020
    Colombia is restarting road construction works on key links.
  • Spanish firms pre-qualify for US$1.15bn worth of Colombian road projects
    August 7, 2013
    Several Spanish firms with operations in Colombia have gained pre-qualification for two tenders to build and maintain two roads in the country requiring an estimated combined investment of US$1.15 billion. OHL Concesiones Chile and OHL Concesiones Colombia (part of the Spanish OHL group), Sacyr Concesiones Colombia (part of Spanish group Sacyr) and Ortiz Construcciones y Proyectos Colombia, and Acciona Concesiones Chile (part of the Spanish group Acciona), are pre-qualified for the Pacific 2 Connection. The