Skip to main content

Germany is developing infrastructure plans

The German Government's new transport investment strategy will see increased spending until 2030. The Ministry for Transport says that the emphasis will be on renovating existing infrastructure, instead of building new projects. Around 70% of investment will be for renovation and improvement projects, compared to 56% in the previous transport strategy. The plan is worth a total of €264.5 billion, an increase of €91 billion over the previous plan, with 49.4% targeted at road projects, 41.3% for rail and 9.3%
March 21, 2016 Read time: 2 mins
The German Government's new transport investment strategy will see increased spending until 2030. The Ministry for Transport says that the emphasis will be on renovating existing infrastructure, instead of building new projects. Around 70% of investment will be for renovation and improvement projects, compared to 56% in the previous transport strategy. The plan is worth a total of €264.5 billion, an increase of €91 billion over the previous plan, with 49.4% targeted at road projects, 41.3% for rail and 9.3% for water transport. The aim of the plan is to cut congestion on major routes.

Within this programme, Bavaria will receive investment worth over €11 billion for transport infrastructure. This will be around 70% more for expansion of road systems than was previously budgeted. As part of the expansion, €1.3 billion will be spent on upgrading the A8 Autobahn between Munich and Traunstein, while over €500 million will be spent on the construction of the A94 Autobahn between eastern Munich and Pocking.

Meanwhile some €2.5 billion will be spent on upgrading and widening the A7 and A1 Autobahn routes near to Hamburg, which will have eight lanes each in future. And €1.07 billion will be spent on transport infrastructure in Saxony. The money should be used for the extension and construction of Autobahn routes, federal roads, and railways in the state.

The Hesse region will receive €4.4 billion for transport projects in the area between the cities of Frankfurt and Mannheim. The regional government will receive €67 million for improvements to the North-West intersection in Frankfurt. Furthermore, the Offenbacher Kreuz interchange will receive investment of €75 million and the Wiesbadener Kreuz junction will be renovated at a cost of €50 million. The A661 Autobahn linking Bad Homburg and Offenbach-Kaiserlei will be improved, with the works costing €272 million.

Related Content

  • Bangladesh moves forward with US$735 million highways programme
    August 5, 2021
    A massive highways development programme is being planned in Bangladesh
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Russian road-building industry on verge of massive cuts
    June 10, 2015
    Russia’s road building programme looks set to be cut due to economic issues - Eugene Gerden writes The Russian Government is considering a significant cut to the existing road building programme for the current year. This is due to a current economic crisis in the country, caused by Western sanctions as well as a collapse in the price of oil and gas.
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe