Skip to main content

Funding found for Ethiopia road project

The World Bank is offering Ethiopia a loan worth US$370 million for the construction of a new expressway. The Ethiopian Roads Authority (ERA) will use the loan to construct the 57km Batu Ziway-Arsi Negele section of the 203km Modjo-Awassa expressway. The loan will be repaid over 38 years with six years of grace period. The Modjo-Awassa expressway has four sections, with the 52km Arsi-Negele section to be funded by China EXIM Bank. Korea EXIM Bank will finance the 37km Meki-Ziway section and the African Deve
June 4, 2015 Read time: 1 min
The World Bank is offering Ethiopia a loan worth US$370 million for the construction of a new expressway. The Ethiopian Roads Authority (ERA) will use the loan to construct the 57km Batu Ziway-Arsi Negele section of the 203km Modjo-Awassa expressway. The loan will be repaid over 38 years with six years of grace period. The Modjo-Awassa expressway has four sections, with the 52km Arsi-Negele section to be funded by China EXIM Bank. Korea EXIM Bank will finance the 37km Meki-Ziway section and the African Development Bank will fund the 57km Mojo-Meki section. The China EXIM Bank is also funding a project to build the Dire Dawa to Djibouti expressway, which is costing around $300 million while CGC Overseas Construction Group is the contractor handling the project.

Related Content

  • Vietnam's road expansion
    May 28, 2012
    Vietnam is seeing significant expansion of its highway network at present, with another three major projects now moving forward and much of the financial backing coming from other Asian nations such as South Korea and Japan. A feasibility study is being carried out for the 94km Nghi Son-Bai Vot expressway and this should be complete by October 2010. The project is expected to cost US$1.04 billion and the expressway will have either six or four lanes, based on Transport Engineering Design's study.
  • Third section of Moscow ring road project
    August 10, 2017
    Financing is being secured for the project to build the third section of Moscow’s ring road. A loan worth around US$642 million will be provided by three banks, the Sberbank, Gazprombank and Eurasian Development Bank (EDB). This section of the ring road lies to the north of the city and measures 105.3km long. The loan for the PPP toll road will be for a 16-year period with the building work being carried out by the Road Construction Corporation. The ring road forms an important link in the chain for the roa
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.